Uncertainty Estimation in Predicting River Discharge Using Probabilistic Machine Learning and Conformal Prediction

Erfan Abdi1,2, Mohammad Taghi Sattari1,2,3, Mahesh Pal4

  • 1Department of Water Engineering, Faculty of Agriculture, University of Tabriz, Tabriz 51666-16471, Iran.

Related Concept Videos

Propagation of Uncertainty from Random Error00:59

Propagation of Uncertainty from Random Error

An experiment often consists of more than a single step. In this case, measurements at each step give rise to uncertainty. Because the measurements occur in successive steps, the uncertainty in one step necessarily contributes to that in the subsequent step. As we perform statistical analysis on these types of experiments, we must learn to account for the propagation of uncertainty from one step to the next. The propagation of uncertainty depends on the type of arithmetic operation performed on...
Uncertainty: Confidence Intervals00:54

Uncertainty: Confidence Intervals

The confidence interval is the range of values around the mean that contains the true mean. It is expressed as a probability percentage. The interpretation of a 95% confidence interval, for instance, is that the statistician is 95% confident that the true mean falls within the interval. The upper and lower limits of this range are known as confidence limits. The confidence limits for the true mean are estimated from the sample's mean, the standard deviation, and the statistical factor 't,' or...
Propagation of Uncertainty from Systematic Error01:10

Propagation of Uncertainty from Systematic Error

The atomic mass of an element varies due to the relative ratio of its isotopes. A sample's relative proportion of oxygen isotopes influences its average atomic mass. For instance, if we were to measure the atomic mass of oxygen from a sample, the mass would be a weighted average of the isotopic masses of oxygen in that sample. Since a single sample is not likely to perfectly reflect the true atomic mass of oxygen for all the molecules of oxygen on Earth, the mass we obtain from this particular...
Typical Model Studies01:30

Typical Model Studies

Fluid mechanics model studies often utilize scaled-down systems to predict fluid behavior in full-scale environments, such as river flows, dam spillways, and structures interacting with open surfaces. Maintaining Froude number similarity in river models is crucial, as it replicates surface flow features like wave patterns and velocities.
Prediction Intervals01:03

Prediction Intervals

The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
The...
Rapidly Varying Flow01:24

Rapidly Varying Flow

Rapidly varying flow (RVF) in open channels is characterized by abrupt changes in flow depth over a short distance, with the rate of depth change relative to distance often approaching unity. These flows are inherently complex due to their transient and multi-dimensional nature, making exact analysis difficult. However, approximate solutions using simplified models provide valuable insights into their behavior.Key Features of Rapidly Varying FlowRVF is commonly observed in scenarios involving...