Stable Observation Generation of Retroreflective Landmarks for Utility-Tunnel Inspection Robots

Jicong Wang1, Hongpeng Li2,3, Jianhua Zhang4

  • 1School of Automation, Hangzhou Dianzi University, Hangzhou 310018, China.

Related Concept Videos

Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device01:30

Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device

Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point served as...
Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...