Column Generation for Action-Based Group Handover Optimization in Large-Scale LEO Satellite Networks

Yang Liu1, Wen Liu1, Wenliang Lin1

  • 1School of Electronic Engineering, Beijing University of Posts and Telecommunications, Beijing 100876, China.

Related Concept Videos

Circular Orbits and Critical Velocity for Satellites01:16

Circular Orbits and Critical Velocity for Satellites

The Moon orbits around the Earth. In turn, the Earth (and other planets) orbit the Sun. The space directly above our atmosphere is filled with artificial satellites in orbit. One can examine the circular orbit, the simplest kind of orbit, to understand the relationship between the speed and the period of planets and satellites with respect to their positions and the bodies that they orbit.
Nicolaus Copernicus (1473-1543) first suggested that the Earth and all other planets orbit the Sun in...
Maximum Size of Aggregate01:12

Maximum Size of Aggregate

The maximum size of aggregate is defined as the aperture of the sieve retaining 15 percent or more of the particles present in the aggregate sample. The aggregate's maximum size impacts the concrete's water requirement, workability, and strength. Larger aggregates reduce the surface area needing cement paste coverage, which can lower water needs, thereby allowing a decrease in the water-to-cement ratio when the desired workability and richness of the mix are to be maintained, which can result...
Reducing Line Loss01:18

Reducing Line Loss

In a three-phase circuit, line loss is an indicator of energy dissipated as heat due to the resistance of transmission lines. To address this, incorporating transformers into the system—a step-up transformer at the source and a step-down transformer at the load—is a strategic solution. Two three-phase transformers are introduced to improve this.
With a step-up transformer at the source, the voltage is increased, thereby reducing the current in the transmission lines since power loss in...
Transmission Line Design Considerations01:23

Transmission Line Design Considerations

Aluminum has become the material of choice for overhead transmission lines, surpassing copper due to its abundance and cost-effectiveness. The most prevalent type is the aluminum conductor, steel-reinforced (ACSR), which combines aluminum strands around a steel core. Other variants include all-aluminum conductors (AAC), all-aluminum alloy conductors (AAAC), aluminum conductor alloy-reinforced (ACAR), and aluminum-clad steel conductors. Advanced designs, such as aluminum conductors with steel...
Pilot and Numeric Relaying01:21

Pilot and Numeric Relaying

Pilot relaying is a type of differential protection used in power systems. It compares electrical quantities at the terminals of equipment via a communication channel instead of direct relay interconnection. This method is essential for transmission lines where the terminals are far apart, typically up to 80 km for lines with 69 to 115 kV ratings. Four types of communication channels are used for pilot relaying:
Cluster Sampling Method01:20

Cluster Sampling Method

Appropriate sampling methods ensure that samples are drawn without bias and accurately represent the population. Because measuring the entire population in a study is not practical, researchers use samples to represent the population of interest.
To choose a cluster sample, divide the population into clusters (groups) and then randomly select some of the clusters. All the members from these clusters are in the cluster sample. For example, if you randomly sample four departments from your...