Related Experiment Video
Updated: Oct 18, 2026

A Uniaxial Compression Experiment with CO2-Bearing Coal Using a Visualized and Constant-Volume Gas-Solid Coupling Test System
Published on: June 12, 2019
Study on the fracture characteristics controlled by filling ratio in cut-and-fill mining
Qingju Qin1,2, Zhiqiang Wang3,4, Changxiang Wang3,4
1School of Mines, China University of Mining and Technology, Xuzhou, China.
Abstract:
To mitigate surface subsidence and stope instability induced by an insufficient filling ratio in cut‑and‑fill mining, this study investigates overlying strata fracture characteristics and instability mechanisms by means of similar material simulation, PFC numerical modeling, and theoretical analysis. Filling ratio acts as the dominant factor for overburden and stope stability: full (100%) filling suppresses roof displacement and key-stratum breakage to realize reliable gangue-pillar bearing and overburden control, whereas 50% insufficient filling triggers key-stratum fracture and domino-style chain failure starting from central goaf gangue pillars, further producing severe overburden destruction and large-magnitude surface subsidence. PFC simulations prove cut-and-fill mining forms a composite three-arch structure, whose evolution under gangue compaction controls overburden damage and surface subsidence. Analysis confirms the criticality of middle gangue pillar stability, so Cut-and-fill mining design should strengthen middle and end gangue pillars. This study clarifies filling ratio control mechanisms, providing technical support for filling parameter optimization and safe, efficient Cut-and-fill mining.
Related Concept Videos
Behavior of Concrete Under Compressive Load
As the concrete specimen fractures under...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Microcracking in Concrete
Additives and Fillers in Concrete
The...