Related Experiment Videos
Physics-Guided Multi-View Transformer with Block Attention Residuals for Cross-Condition Railway Bearing Fault
Junjie Liang1, Guoqiang Cai1, Zhengming Zhang1
1State Key Laboratory of Advanced Rail Autonomous Operation, Beijing Jiaotong University, Beijing 100044, China.
Abstract:
Railway bearings experience speed- and load-dependent distribution shifts that complicate fault diagnosis. This study proposes a Physics-Guided Multi-View Transformer with Block Attention Residuals (PGMV-BAR). Characteristic-order prior tokens sequentially query envelope-order and time-frequency features and remain in the fusion sequence with a separate condition token. A two-stage strategy combines masked reconstruction, contrastive consistency, prior alignment, and supervised fine-tuning. Evaluation follows a source-only cross-condition protocol. Beijing Jiaotong University-Rail Autonomous Operations (BJTU-RAO) includes nine combinations of motor frequency (20, 40, and 60 Hz) and lateral load (-10, 0, and +10 kN), with a constant vertical load of 10 kN. All 36 unordered pairs are evaluated as held-out test conditions, with the remaining seven conditions supplying source training and validation in each task. The L dataset is evaluated through six leave-one-condition-out tasks formed by 1200, 1500, and 1800 r/min at 0% and 10% rated torque, using the other five conditions as sources. Held-out-condition samples are excluded from pretraining, fine-tuning, and checkpoint selection. PGMV-BAR achieves a mean accuracy of 97.27% across the 36 BJTU-RAO tasks (96.05-99.21%) and 95.33% across the L tasks. These results support cross-condition diagnosis within the evaluated datasets.
Related Concept Videos
Directional Relays
Multimachine Stability
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
Power System Three-Phase Short Circuits
Differential Relays
Three-Winding Transformers
In the per-unit equivalent circuit of a grounded Y-Y three-phase...
Bus Impedance Matrix
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...