Behavior of earth-rock cofferdam built on deep overburden foundation considering seepage effect
Related Experiment Video
Updated: Nov 1, 2026

Mechanical Expansion of Steel Tubing as a Solution to Leaky Wellbores
Published on: November 20, 2014
Linsong Zhu1, Shuangquan Li1, Xuewu Sun1
1CCCC Hehai Engineering Corporation Limited, Taixing, China.
Abstract:
An increasing number of water conservancy and hydropower projects are being constructed on deep overburden foundations. Deep overburden foundations have an important influence on the mechanical behavior of earth-rock cofferdams built on them. A three-dimensional coupled seepage-stress finite element model was established to compare the two schemes under different cutoff-wall penetration depths and rapid-drawdown conditions. This paper presents a comparative analysis of the seepage and mechanical behavior of earth-rock cofferdams built on deep overburden foundations with two seepage-control schemes, namely, a composite geomembrane core-wall scheme and a composite geomembrane inclined-wall scheme. The seepage-control performance, stress and deformation characteristics, and slope stability of the cofferdams under the two seepage-control schemes are discussed. In addition, the behavior of the cutoff wall in the deep overburden under different conditions is compared. The results show that when the cutoff wall completely penetrates the overburden, it can effectively reduce the total head and lower the phreatic line in the cofferdam. For all cutoff wall depths, the seepage flow of the core wall scheme is lower than that of the inclined wall scheme. The stress distribution patterns in the cofferdam and cutoff wall are essentially the same for the core wall and inclined wall schemes. However, the tensile stress is slightly higher in the core wall scheme. During water level drawdown, the safety factor of the cofferdam is generally higher for the inclined wall scheme than for the core wall scheme.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Effect of Sea Water on Concrete
Concrete in areas between tide marks, which undergo...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Managing Concrete Workability
To address...
Effects of Creep
Types of Building Separation Joints
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200 feet...