Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Local Anesthetics: Clinical Application as Epidural Anesthesia01:29

Local Anesthetics: Clinical Application as Epidural Anesthesia

889
Epidural anesthetics are administered in the fat-filled epidural space, the outermost part of the spinal canal. This technique is commonly employed for pain management and anesthesia during lower abdomen and pelvis surgeries or labor and delivery.
Since epidural anesthetics can be infused through an epidural catheter, all types of drugs, including short-acting ones, can be administered. Chloroprocaine and lidocaine are examples of short and long-duration anesthetics, respectively. Bupivacaine...
889

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

VR systems in dental education.

British dental journal·2020
Same author

Effect of Dolomitic Lime on Production of Asci and Pseudothecia of Venturia inaequalis and V. pirina.

Plant disease·2019
Same author

Control of Brown Rot and Blue Mold of Sweet Cherry with Preharvest Iprodione, Postharvest Cryptococcus infirmo-miniatus, and Modified Atmosphere Packaging.

Plant disease·2019
Same author

Variability in Postharvest Decay Among Apple Cultivars.

Plant disease·2019
Same author

Involvement of Aureobasidium pullulans and Rhodotorula glutinis in Russet of d'Anjou Pear Fruit.

Plant disease·2019
Same author

Discrete perturbation theory for continuous soft-core potential fluids.

The Journal of chemical physics·2015

Related Experiment Video

Updated: Mar 6, 2026

Anteromesial Temporal Lobectomy for Medically Intractable Temporal Lobe Epilepsy: An Operative Study
11:29

Anteromesial Temporal Lobectomy for Medically Intractable Temporal Lobe Epilepsy: An Operative Study

Published on: August 15, 2025

2.7K

Concurrent delayed temporal and posterior fossa epidural hematomas. Case report.

L A Cervantes

    Journal of Neurosurgery
    |August 1, 1983
    PubMed
    Summary

    This case study details a delayed epidural hematoma appearing in two brain compartments. Early reevaluation with computerized tomography is crucial for timely diagnosis and management of such neurological emergencies.

    Area of Science:

    • Neurology
    • Neurosurgery
    • Radiology

    Background:

    • Delayed epidural hematomas are rare but critical neurological events.
    • Understanding their presentation across different intracranial compartments is essential for effective treatment.

    Observation:

    • A unique case of delayed epidural hematoma manifesting in two distinct intracranial compartments is presented.
    • The clinical course and imaging findings highlight the complexity of this condition.

    Findings:

    • The presumptive mechanism of this delayed, multi-compartmental epidural hematoma is discussed.
    • Computerized tomography (CT) scans are vital for identifying the extent and location of the hematoma.

    Implications:

    • Early and repeated neuroimaging, particularly CT, is strongly recommended for patients with suspected delayed epidural hematoma.

    More Related Videos

    Spinal Hernia Repair and Cauda Equina Repositioning After Lumbar Decompression under Three-Dimensional Microscopy: A Case Report and Literature Review
    04:33

    Spinal Hernia Repair and Cauda Equina Repositioning After Lumbar Decompression under Three-Dimensional Microscopy: A Case Report and Literature Review

    Published on: November 8, 2024

    965
    Minimally Invasive Endoscopic Intracerebral Hemorrhage Evacuation
    09:01

    Minimally Invasive Endoscopic Intracerebral Hemorrhage Evacuation

    Published on: October 15, 2021

    8.7K

    Related Experiment Videos

    Last Updated: Mar 6, 2026

    Anteromesial Temporal Lobectomy for Medically Intractable Temporal Lobe Epilepsy: An Operative Study
    11:29

    Anteromesial Temporal Lobectomy for Medically Intractable Temporal Lobe Epilepsy: An Operative Study

    Published on: August 15, 2025

    2.7K
    Spinal Hernia Repair and Cauda Equina Repositioning After Lumbar Decompression under Three-Dimensional Microscopy: A Case Report and Literature Review
    04:33

    Spinal Hernia Repair and Cauda Equina Repositioning After Lumbar Decompression under Three-Dimensional Microscopy: A Case Report and Literature Review

    Published on: November 8, 2024

    965
    Minimally Invasive Endoscopic Intracerebral Hemorrhage Evacuation
    09:01

    Minimally Invasive Endoscopic Intracerebral Hemorrhage Evacuation

    Published on: October 15, 2021

    8.7K
  • Prompt diagnosis through advanced imaging can significantly improve patient outcomes in neurosurgical cases.