Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Experiment Videos

Critical paths for wound care

R Tallon

    Advances in Wound Care : the Journal for Prevention and Healing
    |January 1, 1995
    PubMed
    Summary
    This summary is machine-generated.

    Critical paths improve healthcare quality by aligning care teams, but are challenging for complex chronic conditions. Effective wound care management requires adapting these pathways, blending medical science with clinical art.

    Related Concept Videos

    You might also read

    Related Articles

    Articles linked to this work by shared authors, journal, and citation graph.

    Sort by
    Same author

    Lactobacillus plantarum 299v surface-bound GAPDH: a new insight into enzyme cell walls location.

    Journal of microbiology and biotechnology·2010
    Same author

    Temporal gene expression and probiotic attributes of Lactobacillus acidophilus during growth in milk.

    Journal of dairy science·2009
    Same author

    Characterization of exopolysaccharides produced by three moderately halophilic bacteria belonging to the family Alteromonadaceae.

    Journal of applied microbiology·2008
    Same author

    Strain- and matrix-dependent adhesion of Lactobacillus plantarum is mediated by proteinaceous bacterial compounds.

    Journal of applied microbiology·2007
    Same author

    Support surfaces--a technology review.

    Nursing management·1996
    Same author

    Technology assessment: analytical product research.

    Nursing management·1996

    Area of Science:

    • Healthcare Management
    • Clinical Medicine
    • Wound Care

    Background:

    • Critical paths and clinical algorithms aid quality management in healthcare.
    • These pathways aim for continuous quality improvement by synchronizing care team actions.
    • Constructing critical paths for patients with chronic illnesses and comorbidities presents significant challenges.

    Purpose of the Study:

    • To explore the challenges and key elements of critical paths in managing complex patient cases.
    • To highlight the difficulties in applying standardized critical paths to chronically ill patients with multiple conditions.
    • To emphasize the blend of art and science in medicine, particularly in wound care management.

    Main Methods:

    • The study discusses the theoretical framework and practical considerations of critical path implementation.

    Related Experiment Videos

  • It examines the essential components clinicians must address, including defining normalcy and managing variances.
  • The abstract implies a qualitative or conceptual analysis of critical path application in diverse clinical scenarios.
  • Main Results:

    • Critical paths are difficult to construct for patients with comorbidities and chronic diseases.
    • Key elements for clinicians include describing normalcy, identifying variances, differential diagnosis, and managing continuity of care.
    • Effective application requires addressing individual patient responses and inter-team communication.

    Conclusions:

    • Attention to critical pathway aspects can enhance continuity of care and cost-effectiveness.
    • Wound care exemplifies the art of medicine, requiring adaptable strategies beyond standardized pathways.
    • The management of chronic wounds remains an underappreciated area within chronic disease management.