Abstract:
The effect of temperature change on the working and setting time of a glass ionomer luting cement and a resin luting cement was measured using the oscillating rheometer. The time taken for each cement to set was calculated from the chart recordings. It was observed that as the temperature increased, the working and setting time of both materials decreased. However, the reduction was much more marked for the dual curing resin cement.
Related Concept Videos
Masonry in Cold and Hot Weather Conditions
Other key practices include keeping masonry units and sand dry and...
Strength and Heat of Hydration
The heat of hydration for each cement compound is significant; for instance, tricalcium aluminate (C3A) and...
Setting Time of Cement
Testing Water Quality
Hot Weather Concreting
Mitigating the heat increase in concrete can be economically achieved by shading aggregate stockpiles to prevent heating from solar radiation,...
Cold Weather Concreting
To counteract the negative impacts of cold weather, ensuring...