Trauma critical pathways: a care delivery system that works

Related Concept Videos

Methods of Documentation VI: Case Management Model01:15

Methods of Documentation VI: Case Management Model

The case management model is a multidisciplinary approach that involves healthcare professionals from diverse disciplines, such as physicians, nurses, therapists, social workers, and pharmacists, working collaboratively to address the various needs of patients. Each healthcare professional brings unique expertise and perspectives, contributing to a more comprehensive understanding of the patient's condition and tailoring treatment plans accordingly.
For example, a patient with a chronic illness...
Methods Of Healthcare Delivery System01:26

Methods Of Healthcare Delivery System

At the different levels of the healthcare system, we see varying methods of healthcare used. These methods include managed care systems, case management, and primary healthcare.
Managed Care System:
The managed care system is designed to control the cost while maintaining the quality of care. The patient's care from admission to discharge is planned by the primary care provider or the case manager, also known as the gatekeeper. In a managed care system, the number of care providers is limited...
Introduction To Health Care Delivery System01:18

Introduction To Health Care Delivery System

The healthcare system is constantly changing and complex. Various services are available from different healthcare providers, but gaining access to these services has become challenging for people with limited healthcare insurance. Uninsured people present a challenge to healthcare because they frequently postpone or forego treatment.
The Institute of Medicine (IOM) advocates for a patient-centered, effective, safe, timely, equitable, and effective healthcare system. The National Priorities...
Nursing Clinical Information System01:27

Nursing Clinical Information System

Nursing Clinical Information System (NCIS)
A Nursing Clinical Information System (NCIS) is a specialized type of healthcare information system tailored to meet the unique needs of nursing practice. It incorporates the principles of nursing informatics to streamline information management and improve the quality of care delivery.
Critical attributes of NCIS include:
Extrinsic and Intrinsic Pathways of Hemostasis01:20

Extrinsic and Intrinsic Pathways of Hemostasis

Blood clotting or coagulation involves extrinsic and intrinsic pathways, which ultimately merge into the common pathway, forming a fibrin clot.
The Extrinsic Pathway
The extrinsic pathway of coagulation is typically initiated by tissue damage that exposes blood to tissue factor (TF), a protein released by the damaged tissue cells outside the blood vessels—this interaction with TF triggers biochemical reactions involving specific clotting factors. The key player here is Factor VII, which forms a...
Traditional Level Of Health Care System01:26

Traditional Level Of Health Care System

The levels of care describe the services provided in the healthcare system. Accordingly, there are six levels of the traditional healthcare system in the US: preventive, primary, secondary, tertiary, restorative, and continuing healthcare. A nurse must understand how the healthcare industry organizes and provides services within these levels of care.
The preventive healthcare service includes tests for screening. Preventive health care services include identifying and reducing disease risk...