Class II subdivision treatment with tip-back moments

B Shroff1, S J Lindauer, C J Burstone

  • 1Department of Orthodontics, University of Maryland School of Dentistry, USA.

Summary

Unilateral tip-back mechanics in orthodontics can cause side effects. This study reviews Class II subdivision malocclusions, focusing on correcting molar axial inclination with tip-back moments for dental asymmetry treatment.

Related Concept Videos

Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Introduction to Vertical Curves01:24

Introduction to Vertical Curves

Vertical curves are parabolic transitions that connect different grades on highways and railroads, ensuring a smooth alignment between back and forward tangents. The back tangent represents the initial grade, while the forward tangent defines the subsequent grade. These curves can be symmetrical, with equal tangent lengths, or nonsymmetrical, with varying lengths. The key points defining a vertical curve include the Point of Vertical Intersection (P.V.I.), where the tangents meet; the Point of...
The Midpoint Rule for Double Integrals01:30

The Midpoint Rule for Double Integrals

The midpoint rule for a double integral provides a practical method for estimating volume over a rectangular region when the surface height varies continuously. In civil engineering, this method is useful for approximating the amount of soil to be moved when planning a road across uneven terrain. The road footprint is represented as a rectangle in the xy-plane. At the same time, the terrain elevation above a flat reference level is described by a continuous height function f(x,y). The objective...
Biological Treatment of Effluent and Waste Water01:30

Biological Treatment of Effluent and Waste Water

Biological wastewater treatment relies on the metabolic activity of microorganisms to remove pollutants from sewage. In modern treatment systems, this process is organized into sequential stages that progressively reduce solid material, dissolved organic matter, and microbial contamination. Each stage plays a distinct role in improving water quality and preparing the effluent for safe discharge or reuse.Primary and Secondary TreatmentPrimary treatment is a physical process that removes large...