Related Experiment Videos
The effects of prepulse-blink reflex trial repetition and prepulse change on blink reflex modification at short and
1Department of Psychology, University of Queensland, Australia.
Abstract:
Prepulse inhibition and facilitation of the blink reflex are said to reflect different responses elicited by the lead stimulus, transient detection and orienting response respectively. Two experiments investigated the effects of trial repetition and lead stimulus change on blink modification. It was hypothesized that these manipulations will affect orienting and thus blink facilitation to a greater extent than they will affect transient detection and thus blink inhibition. In Experiment 1 (N = 64), subjects were trained with a sequence of 12 lead stimulus and 12 blink stimulus alone presentations, and 24 lead stimulus-blink stimulus pairings. Lead interval was 120 ms for 12 of the trials and 2000 ms for the other 12. For half the subjects this sequence was followed by a change in pitch of the lead stimulus. In Experiment 2 (N = 64), subjects were trained with a sequence of 36 blink alone stimuli and 36 lead stimulus-blink stimulus pairings. The lead interval was 120 ms for half the subjects and 2000 ms for the other half. The pitch of the lead stimulus on prestimulus trials 31-33 was changed for half the subjects in each group. In both experiments, the amount of blink inhibition decreased during training whereas the amount of blink facilitation remained unchanged. Lead stimulus change had no effect on blink modification in either experiment although it resulted in enhanced skin conductance responses and greater heart rate deceleration in Experiment 2. The present results are not consistent with the notion that blink facilitation is linked to orienting whereas blink inhibition reflects a transient detection mechanism.