Trauma 24-hour observation critical path

V L Cowell1, D Ciraulo, S Gabram

  • 1Department of Trauma, Hartford Hospital, Connecticut 06102-5037, USA.

The Journal of Trauma
|July 29, 1998
PubMed
Abstract

Related Concept Videos

Traumatic Brain Injury l: Introduction01:28

Traumatic Brain Injury l: Introduction

DefinitionTraumatic brain injury, or TBI, is a disturbance of normal brain function induced by an external mechanical force, such as a direct blow to the head or a penetrating injury. It can affect both brain structure and function, producing a wide range of clinical outcomes. TBI is a heterogeneous condition, meaning its effects may differ based on the type, location, and severity of the injury.Basis of ClassificationTBI is classified based on severity, injury mechanism, or pathophysiology. In...
Acute Coronary Syndrome IV: Interprofessional Care01:28

Acute Coronary Syndrome IV: Interprofessional Care

IntroductionThe management of Acute Coronary Syndrome (ACS) aims to minimize myocardial damage, preserve myocardial function, and prevent complications.Initial ManagementInpatient management involves continuous cardiac monitoring, preferably in an ICU, focusing on blood pressure, serum sodium, potassium, and creatinine levels, and urine output. Ongoing pharmacologic management is crucial for stabilizing the patient.Supplemental Oxygen: Administer supplemental oxygen if oxygen saturation is...
Aneurysm IV: Nursing Management01:22

Aneurysm IV: Nursing Management

Vigilant monitoring for aneurysm rupture is essential for patients undergoing aortic surgery.Preoperative Nursing ManagementContinuously monitor the patient for manifestations of aneurysm rupture, such as pallor, weakness, tachycardia, hypotension, abdominal, back, groin, or periumbilical pain, changes in consciousness, and a pulsating abdominal mass. Regularly assess the patient's peripheral pulses.Instruct the patient to consume a clear liquid diet the day before surgery and administer...