Related Experiment Videos
Abstract:
Below, we present our inspection and preventive maintenance (IPM) procedure for argon-enhanced coagulation units. This new procedure follows the format and numbering system used in the Health Devices IPM System. This procedure is intended for use with the Universal Inspection Form (Form 300-0595), which can be found in the published version of the IPM System, or with a custom checklist generated for this procedure by the IPM Task Manager software provided with the IPM System.