Video Experimental Relacionado
Updated: Feb 20, 2026

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
Gestión de Transiciones Ecosistémicas Utilizando un Marco RAD que Incorpora Contextos Ecológicos, Sociales y
Sebastian Theis1,2, Lyndsay Cartwright3, Marie-Josée Fortin4
1Department of Biology, Environmental Sciences, McGill University, Montreal, QC, Canada. sebastian.theis@mcgill.ca.
Abstract:
Recently, the resist-accept-direct (RAD) framework has emerged as a conceptualized tool for managing ecosystem change. Yet, its application remains limited and uneven across ecological, social, and economic dimensions. To assess how RAD has been implemented to date, we conducted a systematic literature review using a structured PI(E)CO-based search and screening process. Of 473 documents identified, 19 contained case studies and met our inclusion criteria, highlighting the still-early use of RAD in practice. Most case studies focused on resist approaches along the ecological axis, with fewer fully incorporating social or economic considerations. Climate change and biodiversity loss were the most frequently addressed stressors. From our findings and assessed case studies, we developed a RAD strategy advice checklist, designed to guide practitioners in assessing potential trade-offs and implementation constraints, illustrated by a case study from southern Ontario, Canada. Our synthesis assesses the current state of RAD application, laying the groundwork for future knowledge sharing, real-time learning, and the development of broader decision-support networks.
Videos de Conceptos Relacionados
Ecological Disturbance
Radical Reactivity: Overview
Radical Formation: Overview
Radicals from spin-paired molecules:
Radicals can be obtained from spin-paired molecules either by homolysis or electron transfer. While two radicals are formed in the former, an electron is added in the...
Ecological Succession
What is an Ecosystem?
Radial System Protection
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...

