SHAP法による高原道路における都市間バス運行の安全性のリスク要因の解釈可能な分析
Meiping Yun1, Hao Zheng1, Peiyu Lu1
1Urban Mobility Institute, Tongji University, 4800 Cao'an Road, Shanghai 201804, China.
Accident; analysis and prevention
|January 3, 2026
まとめ
No abstract available in PubMed .
関連する概念動画
Survey Safety
347
Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
347
Friction: Problem Solving
466
Friction is an essential force that influences the motion of objects in daily life. Depending on the situation, it can be either beneficial or problematic. Consider a bus with a mass of three megagrams and its center of mass at a specific point, moving along a banked road at a constant speed. The coefficient of static friction between the tires and the road is 0.5. Find the maximum angle of the banked road at which the bus would not slip or tip.
Initially, a visual representation of the...
Initially, a visual representation of the...
466
Manipulation and Analysis
272
GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
272
Design Example: Alignment of a Road Line Using GIS
305
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
305
Design Consideration
506
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
506
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
268
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
268