関連する実験動画

Updated: Jan 7, 2026

Blast Quantification Using Hopkinson Pressure Bars
09:41

Blast Quantification Using Hopkinson Pressure Bars

Published on: July 5, 2016

9.4K

修正: インドの鉱山における石灰岩採掘の可能性を高めるため,近地爆破による地震の持続可能な管理 - ケーススタディ

Aditya Rana1, Arvind Kumar Gond2, Saikat Banerjee2

  • 1Rock Excavation Engineering, CSIR - Central Institute of Mining and Fuel Research, Dhanbad, 826001, India. adityarana.cimfr@csir.res.in.

Environmental geochemistry and health
|January 4, 2026
PubMed
まとめ

No abstract available in PubMed .

さらに関連する動画

Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent
11:14

Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent

Published on: February 21, 2017

12.8K
Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner
06:34

Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner

Published on: October 25, 2017

8.3K

関連する実験動画

Last Updated: Jan 7, 2026

Blast Quantification Using Hopkinson Pressure Bars
09:41

Blast Quantification Using Hopkinson Pressure Bars

Published on: July 5, 2016

9.4K
Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent
11:14

Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent

Published on: February 21, 2017

12.8K
Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner
06:34

Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner

Published on: October 25, 2017

8.3K

関連する概念動画

Quarrying of Stone01:15

Quarrying of Stone

482
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
482
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

378
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
378
JoVE
x logofacebook logolinkedin logoyoutube logo
JoVEについて
概要リーダーシップブログJoVEヘルプセンター
著者向け
出版プロセス編集委員会範囲と方針査読よくある質問投稿
図書館員向け
推薦の声購読アクセスリソース図書館諮問委員会よくある質問
研究
JoVE JournalMethods CollectionsJoVE Encyclopedia of Experimentsアーカイブ
教育
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab Manual教員リソースセンター教員サイト
利用規約
プライバシーポリシー
ポリシー
Jove
Visualize
お問い合わせ