関連する実験動画
Updated: Jan 31, 2026

Swimming Performance Assessment in Fishes
Published on: May 20, 2011
異なるギルドの魚類のパフォーマンスに対する資源レベルと温度依存性の影響の解明
Bass Dye1,2,3, Myron A Peck1,4, Karen E van de Wolfshaar2
1Department of Coastal Systems, NIOZ Royal Netherlands Institute for Sea Research, P.O. Box 59, 1790 AB, Den Burg, Texel, The Netherlands.
Abstract:
The ability to predict how fishes respond to changes in temperature and resource variability is paramount to developing sustainable management plans and for projecting the direct and indirect effects of climate change. We developed a versatile, physiological model capable of providing size-specific estimates of fish growth and fecundity across varying temperatures and resource levels. The model includes a mechanistic representation of individual-level life history processes across diverse biogeographic and functional fish guilds, using direct, species-specific parameter estimates. We demonstrate its application to five marine species (Atlantic cod, Atlantic herring, five-bearded rockling, European sprat and thinlip mullet), which differ in life history strategies and biogeographic distributions, but all rely on intertidal nursery habitats-areas particularly susceptible to anthropogenic change. In all simulations, resource availability had a stronger influence on fish performance than temperature. Nevertheless, the model also revealed how and why higher temperatures often decreased fitness and/or survival of specific types of species. We made no changes to the model structure for different species, and the resulting model predictions were not fitted but were based on eco-physiological first principles. Comparison between modelled and empirical data collected in the shallow Wadden Sea (southern North Sea) confirmed benefits of warming to thermophilic, range-expanding species, while core (established) species at their lower latitudinal limits of their distribution face local extirpation. The model allows insight into more variables than often reported from survey and monitoring efforts, such as reproductive output. The model's broad applicability across a range of species, geographic regions and research objectives makes it valuable for generating knowledge needed to buttress actions aimed at addressing ecological and conservation challenges in a future climate.
関連する概念動画
Temperature Dependence on Reaction Rate
Atoms, molecules, or ions must collide before they can react with each other. Atoms must be close together to form chemical bonds. This premise is the basis for a theory that explains many observations regarding chemical kinetics, including factors affecting reaction rates.
The collision theory is based on the postulates that (i) the reaction rate is proportional to the rate of reactant collisions, (ii) the reacting species collide in an orientation allowing contact between...
Effects of Temperature on Free Energy
Temperature Dependent Deformation
Atomic Spectroscopy: Effects of Temperature
At thermal equilibrium, the relative populations of excited and ground state atoms can be estimated using the Maxwell–Boltzmann distribution. For example, an increase in temperature...
Osmoregulation in Fishes
Short-distance Transport of Resources

