石岩的岩形成,运输和安置在地球地中的位置
N Petford1, A R Cruden, K J McCaffrey
1Centre for Earth and Environmental Science Research, Kingston University, Surrey, UK. n.pet@kingston.ac.uk
Nature
|December 29, 2000
概括
石岩的形成涉及到巨大的岩石变形,挑战了旧的理论. 新的研究表明,花岩岩是一种快速,动态的过程,而不是缓慢的过程,无论构造环境如何.
科学领域:
- 地质地质地质地质地质地
- 石化学 石化学是一门学科.
- 地质化学 地质化学
背景情况:
- 传统上,花岩的起源是由石油学家和地球化学家研究的.
- 最近的共识强调了在花岩置中变形的关键作用.
- 现有的岩石模型面临挑战,原因是不切实际的浮力学假设或对地质物理数据的解释不足.
研究的目的:
- 重新评估已建立的花岩石石化模型.
- 为了研究变形对富有二氧化的融化动态的影响.
- 为了使石油观测与结构和地质物理证据相协调.
主要方法:
- 对流的机械考虑的分析.
- 评估岩石和岩石的浮力学行为.
- 结构和地质物理数据与岩石模型的整合.
主要成果:
- 变形对于分离,运输和安置富含的融物是必不可少的.
- 机械原理表明,花岩的 magma 是一个动态的,快速的过程.
- 据估计,花岩岩的时间尺度为10万年或更短.
结论:
- 花岩的磁性是一种由变形驱动的快速,动态的过程.
- 已建立的岩石模型需要修订,以纳入变形.
- 了解花岩的位置需要考虑连续流动和机械因素.
相关概念视频
Nuclear Localization Signals and Import
Proteins targeted to the nucleus carry short stretches of amino acid sequences called the nuclear localization signal or NLS. Classical nuclear localization signals are of two types: monopartite and bipartite NLS. Monopartite classical NLS (cNLS) consists of a single cluster of 4-8 amino acids. Bipartite cNLS consists of two clusters of 2-3 amino acids and a 9-12 residue long proline-rich linker bridging the two clusters. Signal clusters are rich in positively charged amino acids such as...
Directionality of Nuclear Transport
Ras-related nuclear protein or Ran is a small G protein that cycles between its GTP and GDP bound states. Ran specific regulators, a Ran GTPase Activating Protein or RanGAP present in the cytosol and a Ran guanine nucleotide exchange factor or RanGEF present inside the nucleus regulate GTP/GDP exchange. A high concentration of GTP inside the cells, in addition to this asymmetric distribution of Ran-specific regulators, leads to a higher RanGTP concentration inside the nucleus. This...
Carrier Transport
The generation of electrical current in semiconductors is fundamentally driven by two mechanisms: drift and diffusion. These processes are essential for the functionality and performance of semiconductor-based devices.
Drift Current:
The drift of charge carriers is started by an external electric field (E). Charged particles, such as electrons and holes, experience an acceleration between collisions with lattice atoms. For electrons, this results in a drift velocity (vd) given by:
Drift Current:
The drift of charge carriers is started by an external electric field (E). Charged particles, such as electrons and holes, experience an acceleration between collisions with lattice atoms. For electrons, this results in a drift velocity (vd) given by:
Types of Building Stone
Building stones, essential materials for construction, are extracted from natural rock deposits and processed into specific forms and dimensions suitable for various building applications. These stones are broadly classified into three types based on their geological formation: igneous, sedimentary, and metamorphic.
Igneous rocks are formed from the solidification of magma or lava. An example is granite, known for its durability and resistance to weathering, making it ideal for parts of...
Igneous rocks are formed from the solidification of magma or lava. An example is granite, known for its durability and resistance to weathering, making it ideal for parts of...
Quarrying of Stone
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Preplaced Aggregate Concrete
Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...


