相关概念视频

Photoelectric Effect02:26

Photoelectric Effect

When light of a particular wavelength strikes a metal surface, electrons are emitted. This is called the photoelectric effect. The minimum frequency of light that can cause such emission of electrons is called the threshold frequency, which is specific to the metal. Light with a frequency lower than the threshold frequency, even if it is of high intensity, cannot initiate the emission of electrons. However, when the frequency is higher than the threshold value, the number of electrons ejected...
Emission Spectra02:39

Emission Spectra

When solids, liquids, or condensed gases are heated sufficiently, they radiate some of the excess energy as light. Photons produced in this manner have a range of energies, and thereby produce a continuous spectrum in which an unbroken series of wavelengths is present.
The Uncertainty Principle04:08

The Uncertainty Principle

Werner Heisenberg considered the limits of how accurately one can measure properties of an electron or other microscopic particles. He determined that there is a fundamental limit to how accurately one can measure both a particle’s position and its momentum simultaneously. The more accurate the measurement of the momentum of a particle is known, the less accurate the position at that time is known and vice versa. This is what is now called the Heisenberg uncertainty principle. He mathematically...
Nuclear Binding Energy02:13

Nuclear Binding Energy

The difference between the calculated and experimentally measured masses is known as the mass defect of the atom. In the case of helium-4, the mass defect indicates a “loss” in mass of 4.0331 amu – 4.0026 amu = 0.0305 amu. The loss in mass accompanying the formation of an atom from protons, neutrons, and electrons is due to the conversion of that mass into energy that is evolved as the atom forms. The nuclear binding energy is the energy produced when the atoms’ nucleons are bound together;...
Nuclear Overhauser Enhancement (NOE)01:06

Nuclear Overhauser Enhancement (NOE)

Irradiation of a spin-active nucleus causes an increase or decrease in the signal intensity of neighboring nuclei that are not necessarily chemically bonded or involved in J-coupling. This phenomenon, called the nuclear Overhauser enhancement (NOE), results from through-space interactions between the nuclear spins. The NOE effect decreases with increasing internuclear distance and is generally not observed beyond 4 angstroms. In NOE, dipole-dipole interactions between neighboring spin-active...
Finding Electric Potential From Electric Field01:13

Finding Electric Potential From Electric Field

For a system of charges, it is easy to calculate the system's potential because potential is a scalar quantity. However, in some instances where calculating the electric field is more straightforward than finding the potential, the electric field is used to calculate the system's potential. For a positive charge, the electric field is radially outward, and the potential is positive at any finite distance from the positive charge. In such an electric field, the motion away from the positive...