通过爆发洪水逐渐切割道地
Isaac J Larsen1,2, Michael P Lamb2
1Department of Geosciences, University of Massachusetts, Amherst, Massachusetts 01003, USA.
Nature
|October 14, 2016
概括
灾难性的洪水在地球和火星上造成了峡谷. 新的研究表明,考虑到侵蚀值,洪水排放量比以前估计的小5-10倍,影响了行星表面的修改和气候变化的理解.
科学领域:
- 地形学
- 星球科学
- 水文学
背景情况:
- 星球表面,包括地球和火星, 具有由灾难性的爆发洪水形成的大岩.
- 估计洪水的大小对于了解行星表面的变化,早期火星水文和气候变化至关重要.
- 目前的洪水排放估计通常假定峡谷被填满,但另一个假设考虑侵蚀值.
研究的目的:
- 为了调查峡谷形成的洪水排放估计.
- 测试峡谷形态在切割过程中适应侵蚀值的假设.
主要方法:
- 考虑基石侵蚀门的峡谷切口模型.
- 模型结果与"全面"的洪水估计进行了比较.
- 分析了莫西斯·库利的石流深度指标.
主要成果:
- 考虑到侵蚀值,几乎不变的排放量比Moses Coulee的全边估计低5-10倍.
- 这些较低的排放与石杆流深指标保持一致.
- 全边型号预测了冰川湖爆发洪水的不切实际,单调增长的排放量.
结论:
- 在破碎的岩石中被洪水雕刻的景观可能达到基石侵蚀的门状态.
- 这意味着洪水排放量远低于之前的推断.
- 对地球和火星的灾难性洪水动态和景观演变的理解进行了修订.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
347
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
347
Rapidly Varying Flow
606
Rapidly varying flow (RVF) in open channels is characterized by abrupt changes in flow depth over a short distance, with the rate of depth change relative to distance often approaching unity. These flows are inherently complex due to their transient and multi-dimensional nature, making exact analysis difficult. However, approximate solutions using simplified models provide valuable insights into their behavior.Key Features of Rapidly Varying FlowRVF is commonly observed in scenarios involving...
606
Quarrying of Stone
695
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
695
Design Example: Design of an Irrigation Channel
995
Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
995
Design Example: Maintaining Level of an Embankment
502
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
502
Cavity Drainage and Flashings in Masonry walls
551
Typically, a cavity wall consists of two wythes separated by a gap of at least 2 inches, which may contain insulation while still maintaining a minimum clear space of 1 inch to facilitate adequate drainage. Advanced methods like the insertion of a continuous drainage mat can further reduce this space while ensuring effective moisture expulsion.
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
551