在植入物支持的修复中,如何减少多余的剩余水泥? :一个体外试验研究研究
Aykut Gönder1,2, Serdar Polat3, Mehmet Ali Kılıçarslan4
1Republic of Türkiye Social Security Institution (SGK), Ankara, Turkey.
Clinical implant dentistry and related research
|May 26, 2023
概括
使用口外复制品和特定的通风设计可以显著减少植入物修复中的多余水泥. 选择的水泥也会影响剩余的水泥量,这凸显了这两个因素的重要性.
科学领域:
- 牙科材料科学 牙科材料科学
- 生物材料工程 生物材料工程
- 牙修复 牙修复 牙修复 牙修复 牙修复
背景情况:
- 过多的水泥是植入物支持的修复中常见的并发症,可能导致围植性炎.
- 当前的凝固技术和材料的选择影响了剩余水泥的数量.
- 支柱设计和复制技术为管理多余水泥提供了潜在的解决方案.
研究的目的:
- 评估不同水泥和水泥化技术对剩余水泥的影响.
- 评估风口修改和口外复制技术在减少水泥溢出方面的有效性.
- 确定最佳的组合因素,以最大限度地减少植入物修复中多余的水泥.
主要方法:
- 测试了三个支柱设计 (完全封闭,闭口通风,闭口+近壁通风).
- 外口复制品是使用CAD/CAM技术制造的.
- 评估了三种水泥类型 (双固化树脂,无尤金醇的氧化,聚碳酸盐),包括和没有复制品.
主要成果:
- 根据水泥化技术和水泥类型 (p < 0.05) 观察到残留水泥体积的统计学上显著差异.
- 与没有复制品的组相比,口外复制品显著减少了剩余水泥.
- 树脂水泥产生了最多的剩余水泥.
结论:
- 在支柱上使用口外复制品和特定的通风设计有效地减少了剩余的水泥.
- 水泥的类型显著影响了多余水泥的数量,不论是使用了哪种水泥技术.
- 必须考虑水泥类型和水泥技术,以减少植入物修复中的残余水泥.
相关概念视频
Testing Water Quality
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
Curing of Concrete
The hydration of cement takes place within the water-filled capillary pores. However, environmental elements can disrupt this process by evaporating water from the concrete surfaces. Sealed concrete with a water-cement ratio below 0.5 experiences self-desiccation, leading to water loss. The water loss in concrete is mitigated by curing. This technique involves keeping the concrete saturated to maintain the necessary temperature and moisture conditions, to optimally fill the spaces in the cement...
Plasticizers
Water-reducers, or plasticizers, are chemical admixtures used in concrete to improve strength and workability. These additives reduce the water-cement ratio without compromising workability, lower the cement content while maintaining the same workability, or increase workability to assist concrete placement in inaccessible areas.
Plasticizers function by using surface-active agents to create repulsive electrostatic forces between cement particles. This dispersion enhances the concrete's...
Plasticizers function by using surface-active agents to create repulsive electrostatic forces between cement particles. This dispersion enhances the concrete's...
Superplasticizers
Superplasticizers are advanced admixtures that enhance the workability of concrete by lowering the water content without compromising the strength of the material. These substances are highly effective water reducers, improving concrete flow, making it easier to work with, and enabling concrete to reach inaccessible areas or densely reinforced sections without mechanical vibration. The key components in superplasticizers are either sulfonated melamine or naphthalene formaldehyde condensates,...
Waterproofing and Anti-Bacterial Admixtures in Concrete
Concrete's susceptibility to water absorption is due to the capillary action within the pores of its hydrated cement paste. This action draws water in, creating the need for waterproofing admixtures to prevent such penetration. The efficacy of these admixtures is contingent upon the water pressure, with variations arising from different conditions such as rain, capillary rise, or hydrostatic pressure in structures intended to hold water.
Waterproofing admixtures render concrete hydrophobic,...
Waterproofing admixtures render concrete hydrophobic,...
Design Example: Managing Concrete Workability
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
To address...


