基于沉试验,对散列元素模拟模型的参数校准,用于浸泡田土壤
Zhou Tienan1, Hao Zhou1,2, Jiangtao Ji1,2
1College of Agricultural Equipment Engineering, Henan University of Science and Technology, Luoyang, China.
PloS one
|June 2, 2023
概括
准确的离散元素模拟模型用于田土壤对于优化农业机械至关重要. 这项研究对关键的土壤参数进行了校准,显著提高了田制过程的模拟准确性.
科学领域:
- 农业工程 农业工程
- 计算力学 计算力学 计算力学
- 土壤科学 土壤科学
背景情况:
- 离散元素方法 (DEM) 对于研究在田作业中的土壤机器相互作用至关重要.
- 缺乏准确的田土壤模型,阻碍了DEM在纸研究中的应用.
- 优化打设备需要精确模拟土壤的行为.
研究的目的:
- 使用赫茨-明德林与约翰逊-肯德尔-罗伯茨模型校准DEM参数,用于预先造土土壤.
- 为了确定重要的土壤参数,影响在纸模拟期间的沉降误差.
- 优化这些参数以提高模拟准确度.
主要方法:
- 使用赫茨-明德林与约翰逊-肯德尔-罗伯特斯DEM模型用于土土壤.
- 采用普莱克特-伯曼和最的上升测试来识别和范围的重要参数 (剪切模量,表面能量,摩擦系数).
- 应用了Box-Behnken设计,以建立回归模型并基于slump错误优化参数.
主要成果:
- 确定了土壤剪切模量,表面能量和土壤-铁板静态摩擦系数作为重要因素.
- 确定了最佳参数:表面能量 (3.257 J/m2),土壤剪切模量 (0.709 MPa) 和静态摩擦系数 (0.701).
- 在经过优化参数的模拟测试中,实现了2.04%的平均下滑误差.
结论:
- 校准的DEM参数准确地反映了土土壤的土壤行为.
- 这些经过验证的参数增强了田纸工艺的DEM模拟.
- 改进的模拟精度有助于优化农业机械设计和效率.
相关概念视频
Slump Test
298
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
298
Design Example: Managing Concrete Workability
103
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
103
Modeling and Similitude
299
Scaled modeling is a fundamental technique in engineering, enabling the study of large and complex systems by creating smaller, manageable replicas that recreate critical characteristics of the original. In hydrology and civil infrastructure, for example, scaled models of dams help analyze water flow, turbulence, and pressure. This method allows for accurate predictions of real-world behavior within a controlled environment, significantly reducing the cost and time involved in full-scale...
299
Vebe Test
183
The Vebe test is a method used to measure the workability of concrete, particularly effective for dry concrete mixes. This test employs a specific apparatus that includes a cylindrical chamber, a standard slump cone, and a transparent disc-shaped rider, all mounted on a vibrating table. The cylindrical chamber has dimensions of nine and a half inches in diameter and eight inches in height.
To conduct the test, concrete is placed into the slump cone. The concrete is filled in layers and...
To conduct the test, concrete is placed into the slump cone. The concrete is filled in layers and...
183
Calibration Curves: Linear Least Squares
1.4K
A calibration curve is a plot of the instrument's response against a series of known concentrations of a substance. This curve is used to set the instrument response levels, using the substance and its concentrations as standards. Alternatively, or additionally, an equation is fitted to the calibration curve plot and subsequently used to calculate the unknown concentrations of other samples reliably.
For data that follow a straight line, the standard method for fitting is the linear...
For data that follow a straight line, the standard method for fitting is the linear...
1.4K