相关实验视频
Updated: Jul 27, 2025

06:45
Negative Additive Manufacturing of Complex Shaped Boron Carbides
Published on: September 18, 2018
8.7K
关于3D打印树脂砂芯在造过程中释放的气体的研究
Xiaolong Wang1, Qihua Wu2, Yuhang Huang3
1School of Mechanical, Electronic and Control Engineering, Beijing Jiaotong University, Beijing 100044, China.
Materials (Basel, Switzerland)
|June 10, 2023
概括
砂芯释放的气体显著导致了砂中的气体孔隙缺陷. 这项研究研究了实际造条件下的气体释放,揭示了初始高气体生成率和空心和密心核心打印之间的差异.
科学领域:
- 材料科学与工程 材料科学与工程
- 制造过程 制造过程 制造过程
- 造技术 造技术 造技术
背景情况:
- 气体多孔性是砂造的关键缺陷,通常与砂芯释放的气体有关.
- 现有的沙芯气体释放研究在模拟实际造条件方面存在局限性.
- 了解粘合剂燃烧和气体生成对于减轻气体多孔性至关重要.
研究的目的:
- 在模拟的实际造条件下,研究3D打印的树脂石英砂芯的气体释放行为.
- 分析核心打印设计 (空洞与密集) 对气体产生和排放的影响.
- 评估空气暴露对粘合剂燃烧和随后的气体产生的影响.
主要方法:
- 在件中设计和封闭的砂芯,将核心打印延伸到模具表面.
- 用空心和密集核心打印设计进行比较分析.
- 安装了压力和空气流速传感器,用于监控粘合剂燃烧期间释放的气体.
主要成果:
- 在粘合剂燃烧过程中观察到高初始气体生成率和快速压力峰值.
- 空心打印显示压力峰值为1.09 kPa,排气速度峰值为1.89 m/s.
- 密集核心打印显示排气速度为1m/s500s;空气不足导致粘合剂燃烧不完整,气体产生增加 (在绝缘时增加30.7%).
结论:
- 核心打印的设计显著影响砂造过程中气体释放动态.
- 充分的空气暴露对于完整的结合剂燃烧至关重要,减少了气体生成和潜在的缺陷.
- 这项研究提供了通过优化沙芯设计和通风来控制气体多孔性的见解.
相关概念视频
Porosity in Cement Paste
183
The porosity of concrete is a measure of the void spaces within its structure. These spaces impact its strength and durability significantly. When water and cement interact, a chemical reaction called hydration creates a semi-solid paste. This paste includes combined water, making up approximately 23% of the cement's dry mass, and gel water, which fills minuscule voids known as gel pores, accounting for about 28% of the cement gel volume.
The balance of water to cement in the mix is...
The balance of water to cement in the mix is...
183
Accelerated Curing of Concrete
192
Accelerating concrete curing is achieved by applying heat and additional moisture. This process accelerates the hydration of the cement, resulting in an earlier strength gain in the concrete. Steam curing is a method wherein the concrete products are either transported through a chamber on a conveyor belt or encased in plastic, allowing steam at atmospheric pressure to circulate freely around them. This process begins with a phase of moist curing that typically lasts between 3 to 5 hours, after...
192

