远程关系:业务中断保险和业务关闭保险
1LEBUHN & PUCHTA Partnerschaft von Rechtsanwälten und Solicitor mbB, Am Sandtorpark 2, 20457 Hamburg, Germany.
概括
在COVID-19保险纠纷中,英国和德国的保单持有者看到了不同的结果. 本分析解释了英国业务中断 (BI) 和德国业务关闭 (BC) 保险案例结果背后的法律原因.
科学领域:
- 保险法 保险法 保险法 保险法 保险法
- 流行病风险管理管理
背景情况:
- 全球范围内,COVID-19大流行给全球企业带来了前所未有的挑战.
- 商业保险政策,包括业务中断 (BI) 和业务关闭 (BC) 覆盖,对与大流行有关的索赔进行了仔细审查.
研究的目的:
- 分析英国和德国的COVID-19保险法律问题.
- 解释这些司法管辖区中保险人的不同法庭结果.
- 提供有关传染病保险覆盖的法律情景的见解.
主要方法:
- 英国和德国保险法的比较法律分析.
- 审查关键法院裁决,包括英国FCA试验案和德国联邦最高法院的判决.
- 业务中断和业务关闭保险的历史审查.
主要成果:
- 由于特定的政策措辞和监管干预,英国保险人在很大程度上成功地解决了COVID-19业务中断索赔.
- 德国的保险人面临着关闭业务的重大挑战,法院经常对他们作出裁决.
- 不同的法律解释和监管方法导致了不同的结果.
结论:
- 该研究强调了精确的政策语言在传染病保险中的关键重要性.
- 监管行动和司法解释极大地影响了COVID-19保险纠纷的解决.
- 未来的再保险和保险法律可能会根据与流行病相关的诉讼发生变化.
相关概念视频
Insulation Coordination
174
Insulation coordination is the process of matching electric equipment's insulation strength with protective device characteristics to protect the equipment against expected overvoltages. This selection is based on engineering judgment and cost. Equipment can generally withstand short-duration high transient overvoltages, but repeated tests with identical waveforms can yield inconsistent results. As a result, standard impulse voltage waveforms are used for testing, defined by specific times...
174
Reclosers and Fuses
135
Automatic circuit reclosers enhance the protection of distribution circuits by interrupting and auto-reclosing an AC circuit according to a preset sequence. They effectively manage temporary faults on overhead distribution lines, often caused by tree limbs or wildlife, by briefly disrupting service to improve overall reliability. However, contact with reclosers or energized broken conductors on the ground can pose serious hazards.
A comprehensive protection scheme for radial distribution...
A comprehensive protection scheme for radial distribution...
135
Types of Building Separation Joints
271
Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
271
Line Protection with Impedance Relays
106
Coordinating time-delay overcurrent relays in complex radial systems and directional overcurrent relays in multi-source transmission loops can be challenging. Impedance relays address these issues by responding to the voltage-to-current ratio, specifically measuring the apparent impedance of a line. These relays become more sensitive during faults as current increases and voltage decreases, thereby reducing the apparent impedance.
Under normal conditions, low load currents keep the measured...
Under normal conditions, low load currents keep the measured...
106
Zones of Protection
244
In power systems, the entire setup is divided into protective zones to isolate faults and protect the rest of the network. These zones include generators, transformers, buses, transmission lines, distribution lines, and motors. Each zone can be visualized as a separate room in a house, with each room protected by its own circuit breaker.
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
244
Radial System Protection
125
Radial systems employ time-delay overcurrent relays to reduce load interruptions. When a fault occurs, the nearest breaker opens first, while upstream breakers remain closed due to longer delay settings. This approach ensures minimal disruption to the rest of the system.
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
125

