建筑项目的可持续性评估:在不确定的和不可靠的条件下,可持续的获得价值管理模型
Mahdi Anbari Moghadam1, Morteza Bagherpour1, Seyed Farid Ghannadpour1
1Department of Industrial Engineering, Iran University of Science and Technology, University Ave. Narmak, Tehran, 16846-13114 Iran.
概括
本研究引入了一种新的模糊推理系统模型,使用Z数来评估建筑项目的可持续性,跨经济,社会和环境支柱,解决数据不确定性,以便进行更严格的评估.
科学领域:
- 建设管理建设管理.
- 可持续性科学 可持续性科学
- 模糊逻辑系统 模糊逻辑系统
背景情况:
- 评估建筑项目的可持续性需要平衡经济,社会和环境因素.
- 现有的模型在不确定的数据条件下难以全面评估所有三个支柱.
- 在项目执行期间实时可持续性评估的强大模型中存在差距.
研究的目的:
- 开发一个全面的模糊推理系统 (FIS) 模型来评估建筑可持续性的三个支柱.
- 为了解决数据不确定性,使用Z数来改进社会和环境可持续性指数.
- 增强建筑项目的模糊指数的层次计算方法.
主要方法:
- 开发了一种马姆丹尼模糊推理系统模型,将成本绩效指数纳入经济可持续性.
- 利用专家意见和文献审查来确定可持续性属性和推动因素.
- 改进了使用Z数字的社会可持续性指数,并引入了Z建筑环境可持续性指数.
- 增强了计算模糊指数的层次化方法,以管理复杂性.
主要成果:
- 提出的基于Z数的FIS模型有效地评估了建筑项目的整体可持续性状况.
- 该模型与传统的模糊数字和决定性方法相比,显示出更高的严谨性和有效性.
- 经济,社会和环境可持续性支柱被整合到一个统一的评估框架中.
结论:
- 开发的基于Z数的FIS模型为评估建筑项目的可持续性提供了更强大,更准确的方法.
- 这种方法有效地处理了项目执行期间收集的数据中固有的不确定性.
- 该模型为可持续建筑实践和决策提供了显著的进步.
相关概念视频
Design Example: Sustainability in Concrete Building
199
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
199
Design Example: Managing Concrete Workability
102
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
102
Design Consideration
213
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
213
Workability of Concrete
132
The workability of concrete is a crucial property that affects its handling, placing, and finishing during construction. It describes the ease with which concrete can be mixed, placed, compacted, and finished. Workability is primarily concerned with the concrete's movement and its ability to resist internal friction and external resistance from molds and reinforcements during the application process.
Concrete's workability is determined by its resistance to internal forces that arise...
Concrete's workability is determined by its resistance to internal forces that arise...
132
Uncertainty: Overview
604
In analytical chemistry, we often perform repetitive measurements to detect and minimize inaccuracies caused by both determinate and indeterminate errors. Despite the cares we take, the presence of random errors means that repeated measurements almost never have exactly the same magnitude. The collective difference between these measurements - observed values - and the estimated or expected value is called uncertainty. Uncertainty is conventionally written after the estimated or expected value.
604
Elasticity in Concrete
117
Upon subjecting concrete to moderate or high uniaxial compressive or tensile stresses, the strain response is non-linear relative to the stress applied. As the stress is removed, the resulting stress-strain curve deviates from the original path traced during loading, creating a hysteresis loop, indicative of the concrete's non-linear and non-elastic properties. Typically, a material's modulus of elasticity, which is a measure of the material's stiffness, is inferred from the linear...
117