组织项目管理成熟度的竞争优势:澳大利亚的定量描述性研究
Garry Huang1, Shwn-Meei Lee2, Daniel L Clinciu3
1College of Management, Taipei Medical University, Taipei, Taiwan.
PloS one
|June 27, 2023
概括
组织项目管理成熟度显著提高了合同招标中的竞争优势. 较高的成熟度水平与增加的合同获胜相关,尽管软技能仍然对成功至关重要.
科学领域:
- 企业管理 企业管理
- 组织研究 组织研究
背景情况:
- 组织项目管理成熟度越来越被认为是业务绩效的一个因素.
- 项目管理咨询行业面临着激烈的竞争,竞争优势对于招标成功至关重要.
研究的目的:
- 调查组织项目管理成熟度是否为项目管理咨询行业的企业在合同招标期间提供竞争优势.
- 确定项目管理成熟度水平与对竞争优势的感知之间的关系.
主要方法:
- 澳大利亚项目管理专业人士对150份调查回复进行了定量研究.
- 使用SPSS进行5%置信区间 (alpha) 的数据分析.
- 统计测试用于评估关于项目管理成熟度和竞争优势的假设.
主要成果:
- 发现组织项目管理的成熟度对竞争优势具有统计学上显著的积极影响 (p < .0001).
- 感知到的竞争优势取决于组织项目管理成熟度的达到水平.
- 其他能力,尤其是客户关系和沟通等软技能,也对赢得合同做出了重大贡献.
结论:
- 增强的组织项目管理成熟度直接有助于在合同招标中更强大的竞争地位.
- 组织应专注于发展项目管理成熟度和必要的软技能,以获得最佳的招标成功.
- 实现的项目管理成熟度水平直接影响获得的竞争优势的程度.
相关概念视频
Methods of Documentation VI: Case Management Model
600
The case management model is a multidisciplinary approach that involves healthcare professionals from diverse disciplines, such as physicians, nurses, therapists, social workers, and pharmacists, working collaboratively to address the various needs of patients. Each healthcare professional brings unique expertise and perspectives, contributing to a more comprehensive understanding of the patient's condition and tailoring treatment plans accordingly.
For example, a patient with a chronic...
For example, a patient with a chronic...
600
Methods of Documentation II: POMR
1.0K
The Problem-Oriented Medical Record (POMR) revolutionized medical record-keeping by introducing a systematic approach focusing on the patient's problems rather than merely listing symptoms. Dr. Lawrence Weed's introduction of this method in the 1960s marked a significant advancement in medical documentation. The POMR framework consists of four key components: the database, problem list, plan of care, and progress notes.
1.0K
Decision Making: P-value Method
5.5K
The process of hypothesis testing based on the P-value method includes calculating the P- value using the sample data and interpreting it.
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim is also stated. These statements can act as null and alternative hypotheses: a null hypothesis would be a neutral statement while the alternative hypothesis can...
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim is also stated. These statements can act as null and alternative hypotheses: a null hypothesis would be a neutral statement while the alternative hypothesis can...
5.5K
Production Efficiency
16.9K
Net production efficiency (NPE) is the efficiency at which organisms assimilate energy into biomass for the next trophic level. Due to low metabolic rates and less energy spent on thermoregulatory processes, the NPE of ectotherms (cold-blooded animals) is 10 times higher than endotherms (warm-blooded animals).
16.9K
Factors Affecting Workability
94
The workability of concrete is a critical characteristic that influences the ease of mixing, handling, and finishing the concrete. It is affected by several factors including water content, aggregate properties, and admixtures like air entrainment. Water plays a fundamental role as it lubricates the concrete mix, facilitating easier movement and placement. However, the water requirement varies depending on the texture and shape of aggregates. Finer particles and angular, rough-textured...
94
Quality Assurance
161
Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
161


