相关实验视频
Updated: Jul 23, 2025

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.1K
一个基于多变量分类的模型,用于评估在Fundao尾矿大破裂后,DOCE河流流域对水质的影响
Grazielle Rocha Dos Santos1, Luisa Cardoso Maia1, Fabiana Aparecida Lobo2
1Department of Environmental Engineering, Federal University of Ouro Preto, Ouro Preto, MG, 35400-000, Brazil.
Environmental pollution (Barking, Essex : 1987)
|July 14, 2023
概括
多变量分类模型准确地评估了2015年铁矿石尾矿大破裂后Gualaxo do Norte河流域的水质恢复. 这些模型确定了用于生态系统健康监测的关键水质指标.
科学领域:
- 环境科学 环境科学
- 水质管理水质管理
- 生态系统的恢复生态系统的恢复
背景情况:
- 巴西的Gualaxo do Norte河流域在2015年经历了铁矿石尾矿大破裂的重大环境影响.
- 评估受影响生态系统的恢复需要强大的监测和分析方法.
研究的目的:
- 开发多变量分类模型,用于评估受影响的Gualaxo do Norte河流域的水质恢复.
- 确定关键的水质参数,表明生态系统的健康和恢复状态.
主要方法:
- 在2016年7月至2017年6月期间,从27个地点 (受影响和未受影响) 收集了水质数据 (化学,物理,微生物学).
- 应用多变量分类技术,包括部分最小平方差异分析 (PLS-DA) 和线性差异分析 (LDA).
主要成果:
- PLS-DA和LDA模型成功地分类了三个不同的区域:不受影响的主要河流,受影响的主要河流和支流.
- 模型在预测水质等级方面取得了很高的准确率 (PLS-DA为90%,LDA为91.67%).
- 含量,导电性,度和度被确定为关键的区分变量.
结论:
- 多变量统计工具对于开发生态系统恢复的预测模型是有效的.
- 开发的模型使用易于测量的变量为受影响的河流流域的恢复过程提供了有价值的见解.
- 这项研究为监测重大工业灾害后环境恢复提供了一个框架.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
72
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
72
Quality of Water
129
In concrete preparation, the quality of water is paramount as it affects the strength and durability of the concrete. Potable water is usually preferred; however, it must not have excessive sodium or potassium to prevent compromising the concrete's integrity. Water quality is typically evaluated based on impurities such as dissolved solids, chlorides, and sulfates, and its pH value is ideally between 6 and 8. Even slightly acidic natural water may be acceptable unless it contains harmful...
129
Testing Water Quality
138
When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
138
Responses to Drought and Flooding
10.7K
Water plays a significant role in the life cycle of plants. However, insufficient or excess of water can be detrimental and pose a serious threat to plants.
10.7K
Design Example: Creating a Hydraulic Model of a Dam Spillway
227
Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
227
Typical Model Studies
385
Fluid mechanics model studies often utilize scaled-down systems to predict fluid behavior in full-scale environments, such as river flows, dam spillways, and structures interacting with open surfaces. Maintaining Froude number similarity in river models is crucial, as it replicates surface flow features like wave patterns and velocities.
385

