预先设计和现场测试的屋顶切割的方法在地下煤矿的入口保持在地下煤矿
Ying Chen1, Zikai Zhang1, Shiji Bao1
1College of Mining, Liaoning Technical University, Fuxin 123000, China.
Sensors (Basel, Switzerland)
|July 29, 2023
概括
通过屋顶切割保持入口,这是一种新的长壁采矿技术,优化了资源使用和环境影响. 本研究详细介绍了用于屋顶切割的爆破操作,提供了一种可重复的方法,并将参数与开采后数据联系起来,以改进长壁采矿实践.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 岩石机械学 岩石机械学
- 爆破技术 爆破技术
背景情况:
- 通过屋顶切割保持入口是一种新兴的长墙采矿方法.
- 这种方法提供了高资源利用率和环境效益.
- 目前的优化依赖于现场研究,但缺乏详细的爆炸操作描述.
研究的目的:
- 为了提供一个可重复的建筑方法,用于屋顶的切割操作.
- 为了确定爆破参数和开采后监测数据之间的关系.
- 通过屋顶切割为入口保持技术的理论和技术发展做出贡献.
主要方法:
- 爆炸参数的初步设计基于理论和现场地质.
- 在现场测试方法和设备的详细描述,用于屋顶切割爆炸.
- 使用监测数据和反向分析分析断裂模式和采矿后屋顶洞穴的分析.
主要成果:
- 开发了一种可重复的屋顶切割喷气操作方法.
- 该研究确定了爆炸参数和开采后监测数据之间的相关性.
- 评估了顶部切割的有效性,并动态调整了参数.
结论:
- 这项研究提供了一种实用,可重复的方法,通过屋顶切割来保持入口.
- 它增强了对爆炸参数对采矿结果的影响的理解.
- 为类似的地质工程项目提供了有价值的案例研究数据.
相关概念视频
Design Example: Managing Concrete Workability
101
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
101
Design Example: Maintaining Level of an Embankment
91
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
91
Quarrying of Stone
139
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
139
Design Example: Sustainability in Concrete Building
191
As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
191
Non-destructive Tests for Concrete Strength
144
The rebound hammer test, also known as the Schmidt hammer test, is a non-destructive technique for evaluating the hardness of concrete and, indirectly, the strength of concrete. It operates on the principle that the rebound of a spring-driven mass from a concrete surface correlates to the surface's hardness. The device comprises a mass within a tubular housing, a spring mechanism, and a plunger that strikes the concrete. Upon release, the energy imparted to the mass by the spring causes it...
144
Taping Over Different Ground Profiles
47
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
47


