在粘料填充采矿条件下,对超载运动特征的类似模拟
Pengfei Wu1, Jihe Zhao2, Jiaxu Jin1,3,4
1Liaoning Technical University, Fuxin, 123000, China.
Scientific reports
|August 2, 2023
概括
填充采矿通过提高填充剂强度和控制岩石运动来防止表面沉降. 更高的填充速度减少了超负荷压力和位移,而更大的填充步骤增加了它们,指导了更安全的采矿实践.
科学领域:
- 地质技术工程 地质技术工程
- 采矿工程 采矿工程 采矿工程
- 材料科学 材料科学 材料科学
背景情况:
- 煤炭开采导致地表沉降,影响基础设施和环境.
- 填充采矿是缓解沉降的关键技术.
- 了解填充剂的特性和过载行为对于有效的填充采矿至关重要.
研究的目的:
- 研究填充剂强度的提高及其对填充采矿中的岩石运动控制的影响.
- 确定影响过载故障,应力和位移的关键参数.
- 为促进填充采矿技术提供理论基础.
主要方法:
- 理论分析与类似的模拟实验相结合.
- 使用煤炭,飞灰和水泥进行粘料填充材料的比例测试.
- 在不同的填充速度和步骤下调查过载故障特征.
主要成果:
- 优化的填充剂混合设计符合模拟的强度标准.
- 填充速度和步骤显著影响过载稳定性.
- 增加的填充速度减少了超负荷应力和位移;增加的填充步骤放大了这些变化.
结论:
- 该研究验证了填充材料的强度,并确定了控制过载行为的关键参数.
- 填充采矿策略,通过调整填充速度和步骤,可以有效地防止覆盖的岩石破裂和崩.
- 结果为填充采矿操作提供了实际指导,并支持其更广泛的采用.
相关概念视频
Porosity in Cement Paste
173
The porosity of concrete is a measure of the void spaces within its structure. These spaces impact its strength and durability significantly. When water and cement interact, a chemical reaction called hydration creates a semi-solid paste. This paste includes combined water, making up approximately 23% of the cement's dry mass, and gel water, which fills minuscule voids known as gel pores, accounting for about 28% of the cement gel volume.
The balance of water to cement in the mix is...
The balance of water to cement in the mix is...
173
Design Example: Maintaining Level of an Embankment
91
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
91
Taping Over Different Ground Profiles
47
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
47
Behavior of Concrete Under Compressive Load
212
Concrete exhibits specific behaviors under different compressive loads. Understanding this is crucial for understanding its structural integrity. When concrete undergoes uniaxial compression, it tends to develop cracks that run parallel to the direction of the force. These parallel cracks stem from localized tensile stresses that occur perpendicular to the compression direction. Additionally, angled cracks may appear due to the formation of shear planes.
As the concrete specimen fractures under...
As the concrete specimen fractures under...
212
Slump Test
273
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
273


