没有特色的盐盆上的建造高高的巢穴
1School of Natural Sciences, Macquarie University, Sydney, NSW, 2109, Australia. ken.cheng@mq.edu.au.
Learning & behavior
|August 7, 2023
概括
北非的沙漠,Cataglyphis fortis,在它们的巢穴入口建造了山丘. 这种行为有意帮助食在没有特色的景观上定位它们的巢穴.
科学领域:
- 动物行为 动物行为
- 生态生态学 生态生态学
- 昆虫学 昆虫学是一门学科.
背景情况:
- 沙漠 (Cataglyphis fortis) 居住在视觉上单调的盐盆中.
- 巢的识别对于在中获取食物的成功至关重要.
研究的目的:
- 为了研究由Cataglyphis fortis建造的巢入口山丘的功能.
- 为了确定山丘是否有助于回归的采集者识别巢穴.
主要方法:
- 对行为的观察性研究.
- 对入口结构的实验操作.
- 追踪寻食返回模式的方法.
主要成果:
- 卡塔格利菲斯·福蒂斯 (Cataglyphis fortis) 在它们的巢穴入口建造了山丘.
- 试验性移除或改变山丘显著损害了采集者发现巢穴的可能性.
- 丘陵可以作为视觉地标来识别巢穴.
结论:
- 卡塔格利菲斯·福蒂斯 (Cataglyphis fortis) 建造的巢穴入口山丘是一个有目的的适应.
- 这些结构提高了在充满挑战的环境中寻找食物的的导航效率.
相关概念视频
Responses to Salt Stress
13.2K
Salt stress—which can be triggered by high salt concentrations in a plant’s environment—can significantly affect plant growth and crop production by influencing photosynthesis and the absorption of water and nutrients.
13.2K
Design Example: Maintaining Level of an Embankment
91
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
91
Habitat Fragmentation
17.6K
Habitat fragmentation describes the division of a more extensive, continuous habitat into smaller, discontinuous areas. Human activities such as land conversion, as well as slower geological processes leading to changes in the physical environment, are the two leading causes of habitat fragmentation. The fragmentation process typically follows the same steps: perforation, dissection, fragmentation, shrinkage, and attrition.
17.6K
Posttensioned Masonry Walls
172
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
172
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
71
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
71
Laying Concrete Masonry
125
Constructing a concrete masonry wall involves a series of steps designed to ensure durability, stability, and alignment. The construction starts with preparing the base, which includes cleaning the area where the wall will be erected. The next step involves spreading mortar where the first row of concrete blocks will be laid, typically starting at a corner section to help define the wall's boundaries.
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
125


