一种改进的基于虫的MPPT方法,以减少光伏系统在部分遮阳条件下的跟踪时间和启动振荡

Muhammad Shahid Wasim1, Muhammad Amjad1, Muhammad Abbas Abbasi1

  • 1Faculty of Engineering, The Islamia University of Bahawalpur, Bahawalpur, Punjab, Pakistan.

PloS one
|August 25, 2023
PubMed
概括

一个改进的优化算法 (IGOA) 提高了光伏 (PV) 系统在部分阴影下的性能. 这种新方法以最小的振荡实现更快的全球最大功率点 (GMPP) 追踪,改善能量收集.

相关概念视频

P-N junction01:11

P-N junction

A p-n junction is formed when p-type and n-type semiconductor materials are joined together. At the interface of the p-n junction, holes from the p-side and electrons from the n-side begin to diffuse into the opposite sides due to the concentration gradient. This diffusion of carriers leads to a region around the junction where there are no free charge carriers, known as the depletion region. The charge density within the depletion region for the n-side and p-side can be described by the...
573
Fast Decoupled and DC Powerflow01:24

Fast Decoupled and DC Powerflow

The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
233
Power Factor Correction01:20

Power Factor Correction

The power transmission to a factory involves the transfer of apparent power, a combination of active and reactive power. The power factor measures how effectively electrical power is converted into useful work output. The ratio of the real power (KW) that does the work to the apparent power (KVA) supplied to the circuit.
203
Maximum Power Transfer01:16

Maximum Power Transfer

Numerous practical applications within engineering disciplines, such as telecommunications, necessitate optimizing power delivery to a connected load. This pursuit, however, entails inherent internal losses, which can either equal or exceed the power supplied to the load. The Thevenin equivalent circuit is helpful in finding the maximum power a linear circuit can deliver to a load. It is assumed in this context that the load resistance can be adjusted.
By substituting the entire circuit with...
287
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
138