使用DHGF方法的桥梁监测系统的施工质量评估框架
Jingzhou Xin1, Chen Wang1, Qizhi Tang1
1School of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, China.
Sensors (Basel, Switzerland)
|August 26, 2023
概括
使用改进的Delphi,分析层次流程,灰色关系分析和模糊集成评估 (DHGF) 的新框架有效评估桥梁监控系统. 该方法提供了对系统状态和运行性能的全面评估.
科学领域:
- 土木工程 土木工程是指土木工程.
- 结构健康监测 结构健康监测
- 系统工程 系统工程
背景情况:
- 桥梁监控系统对于基础设施安全至关重要.
- 需要全面的评估框架来评估系统状态.
- 现有的方法可能缺乏评估复杂监控系统的整体方法.
研究的目的:
- 开发和验证桥梁监控系统的新型评估框架.
- 整合多种方法来进行可靠的评估.
- 反映桥梁监控系统的真正建设和运行状态.
主要方法:
- 改进了用于指数确定的Delphi方法.
- 分析层次过程 (AHP) 用于指数加权.
- 灰色关系分析 (GRA) 用于模糊的评估矩阵构造.
- 模糊综合评估 (FCE) 用于最终评估.
主要成果:
- 拟议的DHGF框架已成功应用于一个真正的桥梁监控系统.
- 评估确定该系统的状态为II级.
- 该框架在反映系统的构建和运行状态方面表现出卓越的能力.
结论:
- DHGF框架为评估桥梁监控系统提供了一个全面和有效的方法.
- 这种方法为系统性能和可靠性提供了宝贵的见解.
- 这些发现支持采用基础设施监测评估的综合框架.
相关概念视频
Design Example: Strain Gauge Bridge or Wheatstone Bridge
440
The utilization of strain gauges as transducers for converting mechanical strain into electrical signals is a common practice in various engineering applications. These strain gauges are frequently integrated into Wheatstone bridge circuits to accurately measure parameters such as force or pressure. Within this context, each element within the circuit exhibits a resistance that undergoes subtle variations when subjected to mechanical strain. The primary objective is to convert minuscule...
440
Design Example: Alignment of a Road Line Using GIS
66
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
66
Differential Leveling
212
Differential leveling is a precise method in surveying used to determine the elevation difference between two points. Its primary goal is to establish accurate vertical measurements to create level surfaces or grade lines critical for designing and constructing infrastructures such as roads, bridges, and buildings.The procedure for differential leveling begins with setting up and leveling the instrument at a point where the benchmark can be seen. The level rod is held on the benchmark (BM), and...
212
Design Example: Maintaining Level of an Embankment
91
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
91
Indeterminate Structure
569
Indeterminate structures refer to structures where internal forces and reactions cannot be determined using only the equations of static equilibrium. Indeterminate structures have more unknown forces and reaction forces than equations of static equilibrium that can be used to determine them. Indeterminate structures are often used in engineering to create complex, efficient, and aesthetically pleasing structures. There are various types of indeterminate structures used in engineering and...
569
Wheatstone Bridge
536
An ohmmeter is a resistance-measuring device. It works by applying a voltage to a resistor of unknown resistance and measuring the current across the resistor. The resistance value is deduced using Ohm's law. Usually, the standard configuration of an ohmmeter comprises a voltmeter or an ammeter. However, such configurations are limited in accuracy because the meters alter the voltage applied to the resistor and the current that flows through it.
Thus, for accurate resistance measurements, a...
Thus, for accurate resistance measurements, a...
536