线 (WSN) 使 (GOA)

Mehdi Hosseinzadeh1,2,3, Omed Hassan Ahmed4, Jan Lansky5

  • 1Institute of Research and Development, Duy Tan University, Da Nang, Vietnam.

PloS one
|September 8, 2023
PubMed
概括

本研究介绍了CTTRG,这是一种用于无线传感器网络 (WSN) 的新型路由方法,同时可以确保能源效率和安全性. CTTRG有效地检测恶意节点,并通过平衡寿命和安全性来提高网络性能.

相关概念视频

Distributed Loads: Problem Solving01:21

Distributed Loads: Problem Solving

Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
668
Network Function of a Circuit01:25

Network Function of a Circuit

Frequency response analysis in electrical circuits provides vital insights into a circuit's behavior as the frequency of the input signal changes. The transfer function, a mathematical tool, is instrumental in understanding this behavior. It defines the relationship between phasor output and input and comes in four types: voltage gain, current gain, transfer impedance, and transfer admittance. The critical components of the transfer function are the poles and zeros.
317
IP3/DAG Signaling Pathway01:11

IP3/DAG Signaling Pathway

Membrane lipids such as phosphatidylinositol (PI) are precursors for several membrane-bound and soluble second messengers. Specific kinases phosphorylate PI and produce phosphorylated inositol phospholipids. One such inositol phospholipids are the  phosphatidylinositol-4,5 bisphosphate [PI(4,5)P2], present in the inner half of the lipid bilayer. Upon ligand binding, GPCR stimulates Gq proteins to turn on phospholipase Cꞵ. Activated phospholipase Cꞵ cleaves PI(4,5)P2 and...
12.2K
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
66