重新审视伪超临界路径方法:一种改进的公式,用于化学计算固体-液体共存

Gabriela B Correa1, Yong Zhang2, Charlles R A Abreu3

  • 1Chemical Engineering Program, Instituto Alberto Luiz Coimbra de Pós-Graduação e Pesquisa em Engenharia, Universidade Federal do Rio de Janeiro, Rio de Janeiro RJ 21941-909, Brazil.

PubMed
概括

这项研究增强了伪超临界路径 (PSCP) 方法,用于使用化学自由能计算来预测点. 改进的方法提供了更高的准确性和效率,特别是在复杂的系统,如离子液体.

相关概念视频

Distillation: Vapor–Liquid Equilibria01:01

Distillation: Vapor–Liquid Equilibria

Distillation is a separation technique that takes advantage of the boiling point properties of disparate elements in a mixture. To perform distillation, we begin by heating a miscible mixture of two liquids with a significant difference in boiling points (at least 20°C). As the solution heats up and reaches the bubble point of the more volatile component, some molecules of the more volatile component transition into the gas phase and travel upward into the condenser, which is a glass tube...
2.8K
Chemical Equilibria: Systematic Approach to Equilibrium Calculations01:21

Chemical Equilibria: Systematic Approach to Equilibrium Calculations

Equilibrium calculations for systems involving multiple equilibria are often complex. For example, to calculate the solubility of a sparingly soluble salt in an aqueous solution in the presence of a common ion, one must consider all the equilibria in this solution. Calculations for these systems can be complicated and tedious, so a systematic approach with a series of steps is often helpful. The process is detailed below.
The first step is to identify all the chemical reactions involved, The...
734
Supercritical Fluid Chromatography01:18

Supercritical Fluid Chromatography

Supercritical fluid chromatography (SFC) provides a beneficial substitute for gas chromatography (GC) and liquid chromatography (LC) for certain samples because it merges the top attributes of both techniques. SFC allows the separation and analysis of compounds that GC or LC does not easily manage. These compounds are traditionally nonvolatile or thermally unstable, making GC unsuitable and lacking functional groups required for HPLC analysis.
SFC utilizes a supercritical fluid mobile phase,...
276
Recrystallization: Solid–Solution Equilibria01:10

Recrystallization: Solid–Solution Equilibria

Recrystallization is a purification technique used to separate impurities from solid compounds. In this technique, no chemical reactions occur. Instead, it exploits physical properties only, specifically, the solubility differences between the desired compound and impurities, either at a single temperature or at different temperatures, and under other selected conditions. The solid-solution equilibrium (solubility equilibrium) of each component in the solution represents a binary phase...
1.1K
Clausius-Clapeyron Equation02:35

Clausius-Clapeyron Equation

The equilibrium between a liquid and its vapor depends on the temperature of the system; a rise in temperature causes a corresponding rise in the vapor pressure of its liquid. The Clausius-Clapeyron equation gives the quantitative relation between a substance’s vapor pressure (P) and its temperature (T); it predicts the rate at which vapor pressure increases per unit increase in temperature.
57.0K
Phase Diagrams02:39

Phase Diagrams

A phase diagram combines plots of pressure versus temperature for the liquid-gas, solid-liquid, and solid-gas phase-transition equilibria of a substance. These diagrams indicate the physical states that exist under specific conditions of pressure and temperature and also provide the pressure dependence of the phase-transition temperatures (melting points, sublimation points, boiling points). Regions or areas labeled solid, liquid, and gas represent single phases, while lines or curves represent...
41.4K