抵消尺寸工具:对现场使用的实践和它们的操作性进行审查
Agnès Mechin1, Sylvain Pioch2, Alexandre Cluchier3
1CEFE, Univ. Paul Valéry Montpellier 3, Univ. Montpellier, EPHE, CNRS, IRD, Montpellier, France; ECO-MED, Montpellier, France.
Journal of environmental management
|September 22, 2023
概括
生物多样性抵消大小测量方法对于土地利用规划至关重要,但需要适应. 这项研究发现,为了提高操作性,抵消评估工具必须根据特定的用户和环境量身定制.
科学领域:
- 环境科学 环境科学
- 保护生物学 保护生物学
- 生态规划 生态规划
背景情况:
- 缓解等级是土地利用规划中的生物多样性保护的关键监管机制.
- 实施这种层次结构需要实践人员使用操作偏移尺寸方法.
- 评估这些方法的有用性对于有效的生物多样性保护至关重要.
研究的目的:
- 分析对开发商,环境顾问和政府机构的偏移尺寸方法的实际有用性.
- 确定如何改进这些方法,以提高生物多样性保护的操作性.
- 了解利益相关者的专业知识和背景在应用缓解评估工具中的作用.
主要方法:
- 使用人体工程学方法来分析与偏移尺寸相关的现场实践.
- 使用利益相关者采访和案例研究来收集实际见解.
- 该研究侧重于从从业人员的角度来看,偏移尺寸方法的有用性.
主要成果:
- 抵消尺寸是一个合作过程,涉及开发商,顾问和公职人员.
- 实践者在减缓等级上表现出不同程度的生态知识和专业知识.
- 抵消大小测量方法的有用性在利益相关者群体之间有很大的差异.
结论:
- 抵消大小测量方法对所有利益相关者和背景来说并不同样有用.
- 为了提高操作性,必须根据特定的用户及其环境定制抵消评估工具.
- 定制工具对于改善土地利用规划中缓解等级的实际实施至关重要.
相关概念视频
Design Consideration
203
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
203
Design Example: Calculating Safe Diameter for Wind-Exposed Disc
149
Assessing safety in wind-exposed installations is crucial to preventing potential failures. This example explores the calculation and design adjustments needed to mount a circular disc on a building facade, where wind forces are a primary concern. A 4-meter diameter disc was initially designed as an aesthetic feature facing winds at a velocity of 25 meters per second, with an air density of 1.25 kilograms per cubic meter. Given these conditions, the drag force on the disc was determined using...
149
Scaling
265
In designing and analyzing filters, resonant circuits, or circuit analysis at large, working with standard element values like 1 ohm, 1 henry, or 1 farad can be convenient before scaling these values to more realistic figures. This approach is widely utilized by not employing realistic element values in numerous examples and problems; it simplifies mastering circuit analysis through convenient component values. The complexity of calculations is thereby reduced, with the understanding that...
265
Design Example: Dimensioning of Concrete Masonry Construction
114
For the construction of a storeroom using concrete masonry units, it's essential to align the dimensions of the structure with the actual sizes of the blocks and the intended mortar joints. On the site in question, there's a stockpile of concrete masonry blocks with a nominal size of eight by eight by sixteen inches, which are to be used in the construction of the storeroom.
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
114
Sample Size Calculation
3.4K
Knowledge of the sample size is the first requirement to conduct random sampling or an experiment. The sample size is the total number of units, observations, or groups (in some cases) used to get the data to estimate a population parameter. As the name suggests, the sample size is that of the sample drawn from the population and differs from the population size.
The sample size for the given experiment or sampling effort is fundamental to any study design. Sample size decides the number of...
The sample size for the given experiment or sampling effort is fundamental to any study design. Sample size decides the number of...
3.4K
Design Example: Managing Concrete Workability
95
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
95