Jarosław Kalabis1, Aleksander Kowalski1, Santina Topolska2
1Center of Advanced Materials Technologies, Łukasiewicz Research Network-Institute of Non-Ferrous Metals, 44-100 Gliwice, Poland.
热静态压缩 (HIP) 增强了铜接. 该过程提高了CuAl2多线接中的密度和电导率,同时也使硬度均,以获得更好的机械性能.
科学领域:
- 材料科学 材料科学 材料科学
- 金工业是金工业的一个方面.
- 表面工程是什么?表面工程是什么?
背景情况:
- 青铜对于苛刻的应用至关重要.
- TIG接是连接这些合金的常见方法.
- 优化接特性对于性能至关重要.
研究的目的:
- 为了研究热同静压 (HIP) 对TIG合铜的作用.
- 评估结构变化,机械性能和耐腐蚀性.
- 为了比较商业的CuAl7和实验性的CuAl2多线接.
主要方法:
- 用CuAl7和CuAl2多线进行TIG接.
- 热静态压缩 (HIP) 处理.
- 显微镜,硬度,电导率,密度,三角学和腐蚀测试.
主要成果:
- 在CuAl2接中,HIP提高了密度和同质化的硬度.
- 平均硬度减少了15HV,标准偏差减少了8HV.
- 在HIP之后,CuAl2接中的电导率增加了1.14 MS/m.
结论:
- 热同静压 (HIP) 有效地提高了TIG合青铜的性能,特别是在多线复合材料中.
- 该过程导致密度提高,硬度更加均,电导率提高.
- 对特定铜应用的HIP优化进行进一步的研究是有必要的.
更多相关视频
08:40Ultrasonic Welding of Thermoplastic Composite Coupons for Mechanical Characterization of Welded Joints through Single Lap Shear Testing
Published on: February 11, 2016
14:51An Available Technique for Preparation of New Cast MnCuNiFeZnAl Alloy with Superior Damping Capacity and High Service Temperature
Published on: September 23, 2018
相关概念视频
Steel Fastening Techniques
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...
Residual Stresses
Thermal expansion and Thermal stress: Problem Solving
To solve the problem, first, identify the known and unknown quantities. The initial length (L) of the bridge is 1275 m, the coefficient of linear expansion (α) for steel is 12 x 10-6/°C, and the change in...
Bending of Material: Problem Solving
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...