本研究提出了一种数学模型,以尽量减少洪水灾害期间的救援行动成本. 随机编程方法有效降低了分销费用,成功运营的基准成本为1,016,673.37美元.
科学领域:
- 运营研究 运营研究
- 灾害管理 灾害管理
- 物流物流物流物流物流是什么
背景情况:
- 洪水灾害在全球范围内带来了重大挑战,需要有效地分配人道主义援助.
- 协调救援行动需要尽量降低成本,同时满足各种需求.
研究的目的:
- 开发和应用一个数学模型,以尽量减少在洪水灾害期间的紧急救援行动的成本.
- 优化从供应仓库到配送点的救援物资的分配.
主要方法:
- 使用随机编程来解决多种商品和多种模式网络流量问题.
- 整合了四个供应仓库,六个配送点,两种车辆类型 (直升机和卡车) 和三种救援物资类型 (食品,水,医疗).
- 建模了三种灾难场景 (轻度,中度,严重) 与相关的概率,并使用LINGO软件解决.
主要成果:
- 制定的模型有效地降低了紧急救援行动的分发成本.
- 在成功的救援行动中实现了大约1,016,673.37美元的最小化成本.
- 在需求和满足需求之间显示出最小的差异,表明有效的资源配置.
结论:
- 开发的模型为政府和机构规划灾害响应提供了一个基准成本.
- 航空和公路运输模式的整合优化了交货时间,最终挽救了生命.
相关概念视频
Applications of GIS: Disaster Management and Emergency Response
91
Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
91
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
53
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
53
Fast Decoupled and DC Powerflow
219
The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
219
Design Example: Alignment of a Road Line Using GIS
53
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
53
Uniform Depth Channel Flow: Problem Solving
71
To calculate the flow rate for a trapezoidal channel, first, identify the bottom width, side slope, and flow depth of the channel. The cross-sectional area (A) corresponding to the depth of flow (y), channel bottom width (B), and side slope (θ) is determined by:Next, calculate the wetted perimeter, which includes the bottom width and the sloped side lengths in contact with the water. Using the values of the cross-sectional area and the wetted perimeter, determine the hydraulic radius by...
71
Underflow Gates
65
Underflow gates are vital for controlling water flow in irrigation canals. The three main types of underflow gates — vertical, radial, and drum gates — serve different purposes while ensuring effective flow management. Vertical gates move up and down, generating a free-flowing water jet; radial gates pivot to regulate the flow; and drum gates rotate for precise adjustments. The flow through these gates is influenced by downstream conditions, resulting in free or drowned outflow.Free and...
65