相关实验视频
Updated: Jul 13, 2025

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.1K
测量3-30-300规则以帮助城市达到自然接入门
M H E M Browning1, D H Locke2, C Konijnendijk3
1Virtual Reality and Nature Lab, Department of Parks, Recreation and Tourism Management, Clemson University, Clemson, SC 29631, USA.
The Science of the total environment
|October 13, 2023
概括
3-30-300规则指导公平的城市自然接入. 本研究提供了测量规则的方法.
科学领域:
- 城市生态学 城市生态学
- 环境规划 环境规划
- 公共卫生 公共卫生
背景情况:
- 3-30-300规则为公平的城市自然接入提供了基准.
- 实施需要强大的测量,监测和评估方法.
- 目前用于测量3-30-300规则的指导是有限的.
研究的目的:
- 审查和评估测量3-30-300规则的方法.
- 开发一个适用性矩阵,将测量方法与规则组件联系起来.
- 为实施城市绿化战略提供指导.
主要方法:
- 基于专家的共识方法.
- 审查七个数据和过程措施:植被指数,街道层面分析,树木库存,问卷,窗户视图分析,土地覆盖地图和绿色空间地图.
- 为推措施制定一个适合性矩阵.
主要成果:
- 为"三棵树"组件进行推的调查和窗口视图分析.
- 推用于"30%的树冠"组件的高分辨率土地覆盖地图.
- 推的绿色空间地图与网络分析为"300米接入"组件.
结论:
- 提出的方法有助于实施3-30-300规则和促进地方对话.
- 这些技术支持城市绿化战略投资.
- 城市绿化促进健康,公平,生物多样性和气候适应.
相关概念视频
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
52
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
52
Design Example: Maintaining Level of an Embankment
74
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
74
Areas Within Irregular Boundaries
81
Calculating areas within irregular boundaries, such as along rivers or curved roads, is crucial in various fields, including surveying, engineering, and environmental management. Surveyors often begin by creating a traverse, a connected series of straight lines approximating the area's boundary. The coordinates of each traverse point are essential for calculating the enclosed area. The double meridian distance formula is a widely used technique for this purpose. This method utilizes the...
81
Design Example: Alignment of a Road Line Using GIS
52
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
52
Design Example: Measuring Distance Between Two Points with Obstructions
44
When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
44

