3-30-300规则指导公平的城市自然接入. 本研究提供了测量规则的方法.

相关概念视频

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
52
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
74
Areas Within Irregular Boundaries01:26

Areas Within Irregular Boundaries

Calculating areas within irregular boundaries, such as along rivers or curved roads, is crucial in various fields, including surveying, engineering, and environmental management. Surveyors often begin by creating a traverse, a connected series of straight lines approximating the area's boundary. The coordinates of each traverse point are essential for calculating the enclosed area. The double meridian distance formula is a widely used technique for this purpose. This method utilizes the...
81
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
52
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...