在网络攻击下,与VSC和EV聚合器集成的多区域电力系统的数据驱动负载频率合作控制

Guangdou Zhang1, Jian Li1, Yankai Xing1

  • 1Power System Wide-area Measurement and Control Key Laboratory of Sichuan Province, School of Mechanical and Electrical Engineering, University of Electronic Science and Technology of China, Chengdu, Sichuan, China.

ISA transactions
|October 22, 2023
PubMed
概括

本研究介绍了一种使用多代理深度增强学习 (MADRL) 的合作负载频率控制 (LFC) 策略,以管理电网的电压源转换器 (VSC) 和电动汽车 (EV) 聚合器,即使在网络攻击期间.

相关概念视频

Load-frequency control01:28

Load-frequency control

Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
169
Distributed Loads: Problem Solving01:21

Distributed Loads: Problem Solving

Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
650
Power System Distribution01:25

Power System Distribution

Power system distribution involves delivering electrical energy from power plants to consumers through a network of transmission and distribution systems. The process begins at power plants, where energy from coal, gas, nuclear, water, and wind is converted into electrical energy. These plants use three-phase generators, typically rated between 50 to 1300 MVA, with terminal voltages ranging from a few kV to 20 kV, depending on the size and age of the units.
The transmission system is designed...
242
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
120
Distributed Loads01:19

Distributed Loads

Distributed loads are a common type of load that engineers and scientists encounter in various practical situations. Distributed loads often refer to a type of load spread over a surface or a structure and can be modeled as continuous force per unit area.
For example, consider a bookshelf filled with books stacked vertically adjacent to each other. The weight of the books is evenly distributed over the length of the shelf. As a result, the pressure at different locations on the surface of the...
541
Power System Three-Phase Short Circuits01:21

Power System Three-Phase Short Circuits

Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
93