相关实验视频

Updated: Jul 12, 2025

Tracking Infiltration Front Depth Using Time-lapse Multi-offset Gathers Collected with Array Antenna Ground Penetrating Radar
07:14

Tracking Infiltration Front Depth Using Time-lapse Multi-offset Gathers Collected with Array Antenna Ground Penetrating Radar

Published on: May 1, 2018

7.8K

收回:铁路道雷达的最佳缺陷检测和传感系统,考虑到多传感器系统与主动干扰抑制算法相结合

Computational Intelligence And Neuroscience

    Computational intelligence and neuroscience
    |October 27, 2023
    PubMed
    概括

    这篇文章已被撤回. 由于未披露的问题,原始出版物不再被认为是有效的.

    科学领域:

    • 不适用,因为这是一个撤回通知.

    更多相关视频

    Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
    11:41

    Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation

    Published on: February 1, 2020

    20.4K
    Time Multiplexing Super Resolving Technique for Imaging from a Moving Platform
    06:25

    Time Multiplexing Super Resolving Technique for Imaging from a Moving Platform

    Published on: February 12, 2014

    8.5K

    相关实验视频

    Last Updated: Jul 12, 2025

    Tracking Infiltration Front Depth Using Time-lapse Multi-offset Gathers Collected with Array Antenna Ground Penetrating Radar
    07:14

    Tracking Infiltration Front Depth Using Time-lapse Multi-offset Gathers Collected with Array Antenna Ground Penetrating Radar

    Published on: May 1, 2018

    7.8K
    Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
    11:41

    Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation

    Published on: February 1, 2020

    20.4K
    Time Multiplexing Super Resolving Technique for Imaging from a Moving Platform
    06:25

    Time Multiplexing Super Resolving Technique for Imaging from a Moving Platform

    Published on: February 12, 2014

    8.5K

    相关概念视频

    Radial System Protection01:23

    Radial System Protection

    104
    Radial systems employ time-delay overcurrent relays to reduce load interruptions. When a fault occurs, the nearest breaker opens first, while upstream breakers remain closed due to longer delay settings. This approach ensures minimal disruption to the rest of the system.
    In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
    104
    JoVE
    关于 JoVE
    概览领导团队博客JoVE 帮助中心
    作者
    出版流程编辑委员会范围与政策同行评审常见问题投稿
    图书馆员
    用户评价订阅访问资源图书馆顾问委员会常见问题
    研究
    JoVE JournalMethods CollectionsJoVE Encyclopedia of Experiments存档
    教育
    JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab Manual教师资源中心教师网站
    使用条款与条件
    隐私政策
    政策
    Jove
    Visualize
    联系我们