使用基于网络指标和贪算法的策略恢复电网
Fenghua Wang1, Hale Cetinay2, Zhidong He3
1Faculty of Electrical Engineering, Mathematics and Computer Science, Delft University of Technology, 2628 CD Delft, The Netherlands.
Entropy (Basel, Switzerland)
|October 28, 2023
概括
这项研究评估了连接故障后电网恢复策略. 贪的算法,特别是两步贪的恢复,显著超过了基于单一网络指标的方法.
科学领域:
- 电气工程 电气工程
- 网络科学 网络科学
- 复杂的系统复杂的系统.
背景情况:
- 电网是敏感于随机链路故障的关键基础设施.
- 有效的恢复策略对于电网的弹性和稳定性至关重要.
- 拓网络指标通常被考虑用于链接恢复,但它们的有效性各不相同.
研究的目的:
- 在直流 (DC) 电流模型下,研究和比较电网中各种链路恢复策略的性能.
- 评估基于拓网络指标的策略与启发式方法对比.
- 确定在故障后恢复电网连接的最有效策略.
主要方法:
- 在三个不同的电力系统 (IEEE 30,39 和 118) 中模拟的随机链路故障.
- 评估了13个恢复策略:2个基于链接中心性,8个基于节点中心性产品的节点中心性,以及2个启发式 (贪,两步贪).
- 使用直流电流模型进行策略性能比较.
主要成果:
- 在不同的电力系统中,基于拓度量的策略的性能在不同电力系统中存在显著差异.
- 所有基于拓指标的策略都被启发式恢复策略所超越.
- 两步贪恢复策略表现最好,紧随其后的是贪恢复策略.
结论:
- 依靠单一的拓度量是不足以有效恢复电网连接的.
- 基于贪的恢复策略与单一指标的方法相比,提供了更高的性能.
- 两步的贪恢复策略是提高电网弹性的一种高度有效的方法.
相关概念视频
Fast Decoupled and DC Powerflow
216
The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
216
Maximum Power Flow and Line Loadability
120
The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
120
The Power Flow Problem and Solution
240
Power flow problem analysis is fundamental for determining real and reactive power flows in network components, such as transmission lines, transformers, and loads. The power system's single-line diagram provides data on the bus, transmission line, and transformer. Each bus k in the system is characterized by four key variables: voltage magnitude Vk, phase angle δk, real power Pk, and reactive power Qk. Two of these four variables are inputs, while the...
240
Distributed Loads: Problem Solving
650
Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
650
Distribution Reliability and Automation
109
Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
109
Multimachine Stability
165
Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
165