双孔管道道的表面结算法 穿越高速公路下的双孔管道道
Meilong Deng1, Fei Ding1, Yang Liu1
1China Construction First Group Corporation Limited, Beijing, 100161, China.
Scientific reports
|November 7, 2023
概括
可以优化高速公路下的双孔矩形管道提升结构. 首先挖掘更大的道并保持90度的角度,可以最大限度地减少表面沉积和高速公路变形.
科学领域:
- 土木工程 土木工程是指土木工程.
- 地质技术工程 地质技术工程
- 道工程工程 道工程
背景情况:
- 中国的快速城市化推动了城市地下空间的广泛开发.
- 管道劫持因其效率,适应性和道工程中最小的干扰而受到青.
- 地下基础设施的发展需要了解对高速公路等地表结构的影响.
研究的目的:
- 分析由双孔矩形管道抢断造成的表面沉积和高速公路变形.
- 调查建筑参数对表面沉积的影响.
- 为优化高速公路下的双孔管道提取提供实用建议.
主要方法:
- 使用FLAC软件开发一个三维数值模型.
- 在高速公路下模拟双孔管道吊装施工.
- 用现场监测数据验证数值结果.
- 对挖掘序列和地下通道角度进行参数研究.
主要成果:
- 该研究确定了不对称的定居谷,在高速公路斜坡底部的偏移中心.
- 挖掘序列显著影响了表面沉积模式.
- 高速公路和提升轴之间90°的潜入角可以最大限度地减少表面沉积.
结论:
- 双孔管道劫持的最佳建造顺序是"先大,然后小".
- 建议采用90°的潜入角度,以减少对表面沉积物的冲击.
- 这些发现为设计和建造双孔管道接地下通道结构提供了宝贵的指导.
相关概念视频
Design Example: Joints in Concrete Pavements
195
Concrete pavement joints are essential for maintaining the structural integrity and longevity of pavement by controlling where and how the pavement cracks. These joints can be categorized based on their functions, such as contraction or control joints, construction joints, isolation joints, and expansion joints.
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
195
Design Example: Alignment of a Road Line Using GIS
51
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
51
Types of Building Separation Joints
234
Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
234
Multiple Pipe Systems
768
Multipipe systems consist of complex configurations of interconnected pipes designed to transport fluids efficiently across intricate networks. They are essential in engineering applications requiring precise control over flow distribution, pressure, and head loss. They are categorized into series, parallel, loop, and network configurations, each distinguished by unique flow characteristics and applications.
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
768
Introduction to Vertical Curves
40
Vertical curves are parabolic transitions that connect different grades on highways and railroads, ensuring a smooth alignment between back and forward tangents. The back tangent represents the initial grade, while the forward tangent defines the subsequent grade. These curves can be symmetrical, with equal tangent lengths, or nonsymmetrical, with varying lengths. The key points defining a vertical curve include the Point of Vertical Intersection (P.V.I.), where the tangents meet; the Point of...
40
Placing Concrete
112
The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
112