:.

概括

这项研究介绍了CHNN,一种新的超图神经网络,用于改进相关时间序列预测. CHNN有效地捕捉复杂的关系,在现实世界的应用中表现优于现有方法.

相关概念视频

Time-Series Graph00:54

Time-Series Graph

A time-series graph is a line graph with repeated measurements taken at successive intervals of time. It is also called a time series chart. To construct a time-series graph, one must look at both pieces of a paired data set. The horizontal axis is used to plot the time increments, and the vertical axis is used to plot the values of the variable that one is measuring. By using the axes in this way, each point on the graph will correspond to time and a measured quantity. The points on the graph...
4.4K
Sequence Networks of Rotating Machines01:24

Sequence Networks of Rotating Machines

A Y-connected synchronous generator, grounded through a neutral impedance, is designed to produce balanced internal phase voltages with only positive-sequence components. The generator's sequence networks include a source voltage that is exclusively in the positive-sequence network. The sequence components of line-to-ground voltages at the generator terminals illustrate this configuration.
Zero-sequence current induces a voltage drop across the generator's neutral impedance and other...
105
End Point Prediction: Gran Plot01:07

End Point Prediction: Gran Plot

A Gran plot is used to predict the equivalence volume or endpoint of a potentiometric or acid-base titration without reaching the endpoint. Typically, titration data is collected as a function of the titrant's volume up to a point less than the equivalence volume and then transformed into a linear format. The straight line is extended to the x-axis, indicating the necessary titrant volume to achieve the equivalence point.
For potentiometric titration, the Gran plot is created by plotting...
344
Prediction Intervals01:03

Prediction Intervals

The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
2.3K
Vector Algebra: Graphical Method01:10

Vector Algebra: Graphical Method

Vectors can be multiplied by scalars, added to other vectors, or subtracted from other vectors. The vector sum of two (or more) vectors is called the resultant vector or, for short, the resultant.
We use the laws of geometry to construct resultant vectors, followed by trigonometry to find vector magnitudes and directions. For a geometric construction of the sum of two vectors in a plane, we follow the parallelogram rule. Suppose two vectors are at arbitrary positions. Translate either one of...
12.2K
Linear Approximation in Time Domain01:21

Linear Approximation in Time Domain

Nonlinear systems often require sophisticated approaches for accurate modeling and analysis, with state-space representation being particularly effective. This method is especially useful for systems where variables and parameters vary with time or operating conditions, such as in a simple pendulum or a translational mechanical system with nonlinear springs.
For a simple pendulum with a mass evenly distributed along its length and the center of mass located at half the pendulum's length,...
84