关于优化平定山煤矿高层钻井布局参数的研究
1College of Innovation and Practice, Liaoning Technical University, Fuxin, 123000, China.
Scientific reports
|November 13, 2023
概括
在平丁山煤矿优化高层钻井布局减少了天然气灾害. 这项研究确定了理想的钻孔角度和长度,确保安全的采矿操作和有效的天然气提取.
科学领域:
- 采矿工程 采矿工程 采矿工程
- 地质技术工程 地质技术工程
- 安全科学安全科学 安全科学
背景情况:
- 高气体煤层在采矿中构成重大安全风险.
- 高效的天然气开采对于防止采矿灾难至关重要.
- 以前的方法缺乏针对特定地质条件的优化钻探参数.
研究的目的:
- 优化高层钻井布局参数,以提高气体提取效率.
- 为了降低高气体煤层中气体灾害的风险.
- 为了提高平定山煤矿天然气开采的效率.
主要方法:
- 对超负荷层的"三个区域" (洞穴,裂,断裂) 的分析.
- COMSOL数值模拟用于分析钻井孔的升高角度,近视角和长度.
- 模拟衍生的最佳钻孔参数的现场验证.
主要成果:
- 最佳钻井孔升高角度:9°-12°,近视角30°-45°,长度150米.
- 现场数据证实了最佳参数:海拔8°-11°,光线30°-42°,长145-155米.
- 在关键矿区,气体度保持在1%以下.
结论:
- 优化的高层钻井布局显著提高了天然气提取效率.
- 该研究确保了高气体条件下的安全采矿操作.
- 这些发现为平丁山和类似矿山的高峰气体控制提供了宝贵的参考.
相关概念视频
Design Example: Maintaining Level of an Embankment
72
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
72
Design Example: Design of an Irrigation Channel
109
Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
109
Transmission Shafts: Problem Solving
241
Designing a solid shaft that transmits power from a motor to a machine tool involves a series of calculations to ensure the shaft can withstand the stresses applied by bending moments and torques. First, calculate the torque exerted on the gear, considering the power transmitted by the shaft and its rotational speed. Following this, compute the tangential forces acting on the gears, which directly relate to the torque and the gear radius.
Next, use bending moment diagrams for the shaft to...
Next, use bending moment diagrams for the shaft to...
241
Field Procedure for Staking Out Curves
52
Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
52
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
51
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
51
Profile Leveling and Cross Sections
270
Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes. Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
270