Gregory Eddy1, Jonathan Pease2, Cassandra Johnston2

  • 1National Grid, New York Emergency Planning.

概括

导航复杂的监管监管对于电力公用事业业绩效至关重要. 这篇论文考察了纽约州的情况.

相关概念视频

Load-frequency control01:28

Load-frequency control

Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
168
Distribution Reliability and Automation01:25

Distribution Reliability and Automation

Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
108
Turbine-Governor Control01:17

Turbine-Governor Control

Turbine-governor control is crucial for maintaining power system stability by balancing turbine mechanical power output with electrical load demand. This mechanism ensures that generator frequency and rotor speed are within acceptable limits during load variations. Turbine-generator units store kinetic energy due to their rotating masses; this energy is released to meet the load requirement when the load increases. The electrical torque of turbines rises to meet the demand, whereas the...
237
Insulation Coordination01:23

Insulation Coordination

Insulation coordination is the process of matching electric equipment's insulation strength with protective device characteristics to protect the equipment against expected overvoltages. This selection is based on engineering judgment and cost. Equipment can generally withstand short-duration high transient overvoltages, but repeated tests with identical waveforms can yield inconsistent results. As a result, standard impulse voltage waveforms are used for testing, defined by specific times...
149
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
50
Control of Power Flow01:30

Control of Power Flow

There are several methods to control power flow in power systems:
271