超越数字影子:数字双胞胎用于监控大型基础设施项目的土工操作
Kay Rogage1, Elham Mahamedi1, Ioannis Brilakis2
1Northumbria University, Newcastle Upon Tyne, UK.
概括
本研究介绍了建筑的数字双胞胎 (DT) 框架,重点是土工操作. 开发的原型增强了生产力测量和监测,为大型项目提供实时见解.
科学领域:
- 建设管理建设管理.
- 数字工程 数字工程是数字工程.
- 资产管理资产管理.
背景情况:
- 目前的数字双胞胎 (DT) 研究主要涉及建筑资产和城市环境的运营阶段.
- 数字生在施工阶段的应用,特别是土工操作,仍然未被充分探索.
研究的目的:
- 提出一个专门为建设阶段设计的数字双胞胎框架.
- 开发和测试数字双胞胎原型,用于监测土工生产力和运营.
主要方法:
- 数字双胞胎框架建立在多功能性,可扩展性,可用性和自动化原则之上.
- 云计算和仪表板可视化被用于自动化数据管道,可扩展的分析和近乎实时的洞察力.
- 一个原型在英格兰东北部的一条高速公路土工项目中进行了测试.
主要成果:
- 数字双胞胎原型成功预测了设备利用率和生产率.
- 它准确地检测了不同任务 (装载,运输,倾倒,返回,空) 的时间分配,设备的行程距离和速度分布.
- 该系统提供了土工操作的可视化,提供了关键的见解.
结论:
- 开发的数字双胞胎框架和原型是有效的监测和提高生产率在建筑土工作业.
- 数字技术方法提供了宝贵的近乎实时的洞察力,这对于管理大规模,动态的建筑项目至关重要.
- 多功能性,可扩展性,可用性和自动化的原则是成功应用数字双胞胎在施工阶段的关键.
相关概念视频
Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device
40
Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point...
40
Taping Over Different Ground Profiles
27
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
27
Electronic Distance Measuring Instruments
37
Electronic Distance Measuring Instruments (EDMs) are essential tools in modern surveying, offering precise distance measurements by emitting electromagnetic signals and calculating the time required for these signals to travel to a target and return. Two primary types of signals are used in EDMs — light waves and microwaves — each suited to specific environmental and distance requirements. Light-wave-based EDMs utilize either infrared or laser light, providing high accuracy over short...
37
Methods of Obtaining Topography
68
Topography involves measuring and mapping land elevations, natural features, and artificial structures to create accurate representations of the terrain. Topographic surveying relies on traditional and modern methods, each with distinct advantages and limitations.Traditional Surveying Methods:Transit stadia surveys and plane table surveys were widely used traditional surveying methods. These techniques relied on instruments like theodolites and stadia rods for measuring distances and angles,...
68
Design Example: Maintaining Level of an Embankment
69
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
69
Profile Leveling and Cross Sections
258
Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes. Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
258


