相关实验视频
Updated: Jul 9, 2025

12:44
Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
8.0K
固体废物填充和道路保持长壁采矿的数字调查
Kai Sun1,2, Yongjin Huo1,2, Jian Li3
1China National Coal Group Corporation, Beijing, 100120, China.
Heliyon
|November 30, 2023
概括
固体废物填充有效控制表面沉降和道路变形. 80%的填充率是管理覆盖岩石运动和增强后填充采矿期间保留的道路稳定性的最佳.
科学领域:
- 地质技术工程 地质技术工程
- 采矿工程 采矿工程 采矿工程
- 环境工程环境工程
背景情况:
- 固体废物填充和道路支对于管理表面沉降和污染至关重要.
- 评估回填采矿对地层和道路稳定性的影响至关重要.
研究的目的:
- 分析影响表面沉降和岩石变形的因素,在回填采矿过程中.
- 确定最佳的固体废物填充率,以控制沉降并提高道路稳定性.
主要方法:
- 沉降因子的理论分析.
- 覆盖岩石迁移和道路变形的数值模拟.
- 基础系数和填充率影响的计算.
主要成果:
- 填充率是控制屋顶沉降的主要因素.
- 70%和80%的填充率有效地控制了上面的岩石沉降.
- 80%的填充率优化了道路的稳定性和沉降控制.
结论:
- 固体废物填充是控制表面沉降的有效方法.
- 填充率是管理沉降和道路稳定的关键参数.
- 80%的填充率为回填采矿业务提供了最佳的性能.
相关概念视频
Design Example: Maintaining Level of an Embankment
69
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
69
Slump Test
231
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
231
Compacting Factor test
163
The compacting factor test is a method used to assess the workability of concrete. It is especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
163
Design Example: Alignment of a Road Line Using GIS
49
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
49
Aggregates Classification
327
Aggregate classification is generally based on its size, petrographic characteristics, weight, and source. Size classification ranges from coarse to fine aggregates, defined by the size of the particles. Coarse aggregates are particles that do not pass through ASTM sieve No. 4, and aggregates that pass through the sieve are fine aggregates.
Petrographic classification groups aggregates based on common mineralogical characteristics. Some of the common mineral groups found in aggregates are...
Petrographic classification groups aggregates based on common mineralogical characteristics. Some of the common mineral groups found in aggregates are...
327
Design Example: Managing Concrete Workability
83
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
83