使CNN,

Kai Liu1, Jianxin Zhang2, Junfei Liu2

  • 1School of National Safety and Emergency Management, Beijing Normal University, 19 Xinjiekou Wai Ave., Beijing 100875, China; Joint International Research Laboratory of Catastrophe Simulation and Systemic Risk Governance, Beijing Normal University at Zhuhai, Zhuhai 519087, China; Collaborative Innovation Center on Forecast and Evaluation of Meteorological Disasters (CIC-FEMD), Nanjing University of Information Science & Technology, China.

PubMed
概括

中国的土地沉降易感性受到人口,GDP和地下水变化的重大影响. 未来的预测表明,高风险地区将扩大,使人口和基础设施暴露于这种地缘环境危害中.

相关概念视频

Survival Tree01:19

Survival Tree

Survival trees are a non-parametric method used in survival analysis to model the relationship between a set of covariates and the time until an event of interest occurs, often referred to as the "time-to-event" or "survival time." This method is particularly useful when dealing with censored data, where the event has not occurred for some individuals by the end of the study period, or when the exact time of the event is unknown.
 Building a Survival Tree
Constructing a...
87
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
50
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
69