确定马来西亚建筑行业的关键事故引起因素
Olatoyese Zaccheus Oni1, AbdulLateef Olanrewaju1, Khor Soo Cheen1
1Department of Construction Management, Universiti Tunku Abdul Rahman, Malaysia.
International journal of occupational safety and ergonomics : JOSE
|January 20, 2024
概括
本研究确定了导致马来西亚建筑事故的11个关键因素. 解决这些问题,从管理问题到工作环境,对于降低事故率至关重要.
科学领域:
- 职业健康和安全问题 职业健康和安全问题
- 建设管理建设管理.
- 工业心理学 工业心理学
背景情况:
- 建筑行业,尽管具有经济意义,但受到高事故率的困扰.
- 确定这些事故的根本原因对于制定有效的安全干预措施至关重要.
研究的目的:
- 确定马来西亚建筑行业事故的关键潜在原因.
- 为建筑业的利益相关者提供可操作的见解,以减少事故.
主要方法:
- 综合性文献审查,以确定潜在的事故原因.
- 基于已识别的因素,开发调查问卷.
- 使用探索因素分析 (EFA) 和确认因素分析 (CFA) 分析初级数据的分析.
主要成果:
- 确立并确认了11个不同的事故原因集群.
- 关键因素包括管理问题,培训不足,监督,心理健康,态度,资金,经验,材料处理,安全实践,方向和工作环境.
结论:
- 解决所有11个确定的因素对于显著减少事故发生至关重要.
- 调查结果为建设利益相关者提供了有针对性的指导,以提高工地安全.
更多相关视频
相关概念视频
Design Consideration
187
Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
The factor of safety is another key...
187
Fundamental Attribution Error
12.9K
According to some social psychologists, people tend to overemphasize internal factors as explanations—or attributions—for the behavior of other people. They tend to assume that the behavior of another person is a trait of that person, and to underestimate the power of the situation on the behavior of others. They tend to fail to recognize when the behavior of another is due to situational variables, and thus to the person’s state. This erroneous assumption is...
12.9K
The Availability Heuristic
6.0K
A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
6.0K
Design Example: Managing Concrete Workability
81
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
81
Mass Concreting
64
Mass concreting refers to the process of placing large volumes of concrete, such as in gravity dams. The heat generated during the cement hydration process and differential cooling rates within the concrete mass can lead to a temperature gradient, which can result in thermal cracks in the concrete mass.
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
64
Microcracking in Concrete
122
Microcracking in concrete refers to the tiny cracks that can form within the material even before any external load is applied. These microcracks typically occur at the interface between the coarse aggregate and the hydrated cement paste, often as a result of differential volume changes prompted by variations in stress-strain behavior, as well as thermal and moisture movement. Initially, these microcracks remain stable and do not grow substantially until the concrete is stressed to about 30...
122